Search Documents

  • DFI
    Conventional And Box-Shaped Piled Rafts

    By Heinz Brandl

    Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The

    Jan 1, 2002

  • AUSIMM
    Conventional and real-time sampler comparison study for inhalable and respirable dust

    By B Walsh, M Cattani, S Verpaele

    With the increasing sophistication of real-time sampling devices for occupational hygiene exposure assessment, research to objectively assess their performance is a priority. Using real-time monitorin

    Apr 16, 2024

  • SME
    Conventional Excavation of New Inlet/Outlet Tunnel for Newell Creek Dam, CA - NAT2022

    By Kexin Cai, Isidro Rivera, Shawna Von Stockhausen, Maria Chastka, Kevin Huynh

    The Newell Creek Dam Inlet/Outlet Replacement Project is located approximately 11 miles north of Santa Cruz, California along Highway 9 in the San Lorenzo Valley. This project will replace the existin

    Dec 1, 2022

  • CIM
    Conventional or High Capacity Thickeners, a Better Choice to Make

    By J. P. Grau, J. Z. Lu

    "Thickeners/clarifiers are widely used in coal preparation plants, potash processing and other mineral processing facilities. Thickeners play a very important role in slurry treatment systems to accom

    Jan 1, 2012

  • CIM
    Conventional Shaft Sinking Unconstrained by Equipment Availability

    By S. W. Henley

    "Shaft sinking design is typically driven by what has been successful in the past and the availability of sinking plant. This document considers a project where the sinking design and methodology is u

    Jan 1, 2019

  • SME
    Conventional Small Drilling Equipment

    By E. H. Kurt

    INTRODUCTION The simplest way to drill a hole into rock is to strike a steel chisel or drill bit with a hammer. Early miners used this elementary hand technique so successfully in "single jacking" an

    Jan 1, 1982

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • NIOSH
    Conventional Versus Developing Processes Of Phosphatic Clay Disposal: A Technical Evaluation

    By Jerry T. McLendon

    The proper disposition of phosphatic clays has been the subject of research and debated for years by phosphate producers, State and Federal research agencies, regulatory authorities, and environmental

    Jan 1, 1984

  • SME-ICGCM
    Convergence And Load Measurements In An Underground Mine In [Türk±ye]

    By A. G. Pasamehmetoglu

    This paper describes the conver¬gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventional tim

    Jan 1, 1992

  • CIM
    Convergence behaviour — packing relations of full extraction gate roadways at OAL lignite mine

    By C. Karpuz, Y. S. Istanbulluoglu

    This paper describes the results of convergence measurements conducted about five years for the re-use gate roadways at OAL lignite mine in Turkey. Double lignite seams separated with a marn layer, ar

    Jan 1, 1997

  • SME-ICGCM
    Convergence Characteristics of the Rocks Surrounding the Tailgate Supported with Roof Bolts in the Fault-Affected Zone

    By Xinxian Zhai

    Jining No. 3 Coal Mine, a subsidiary of Yanzhou Coal Company Limited. China, is a super-large modern mine. The coal mine is not only the first one constructed with five-million tons of designed produc

    Jan 1, 2007

  • NIOSH
    Convergence Measurements For Squeeze Monitoring: Instrumentation And Results

    By Eric R. Bauer

    The magnitude and rate of advance of an inmine coal squeeze was deter-mined by measuring roof-to-floor convergence on a regular basis. A dial-gage tube extensometer was used to collect data. Using the

    Jan 1, 1981

  • AIME
    Convergence of Roof and Floor in the Mine of the United States Potash Company

    By C. A. Pierce

    STUDIES of roof and floor movement are of interest to those actively engaged in mining. This is especially true in the case of an entirely new area where there is no precedent for guidance. The potas

    Jan 1, 1938

  • CIM
    Convergence of Safety Technologies ISARC ? World Mining Congress 2013

    Pressure for Better Safety Practices ? Increase Government Regulation ? Safety practices evolve from: ? Increased efficiency and performance ? More knowledgeable workforce ? Focus on decreasing

    Aug 1, 2013

  • AUSIMM
    Convergence Tectonics and Sediment Subduction Process Along the Peru Trench*

    Long-range side-scan sonar and conventional geophysical data for the Peru Trench region (8`S-15¦S latitude) have been analysed. The data show that the Peru Trench is a site of sediment subduction wher

    Jan 1, 1990

  • CIM
    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • DFI
    Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large Diameter

    By Peng Jiahong

    With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic

    Jan 1, 1991

  • CIM
    Conversion from "post" pillar cut-and-fill mining to blasthole-a case study at Falconbridge

    By J. Lebl, S. Bharti, D. J. Cornett

    "This paper presents the design and application of blasthole mining to an area at Strathcona Mine previously employing post pillar cut-and-fill. Extensive mining in the area had led to gradually deter

    Jan 1, 1983

  • CIM
    Conversion from Open Pit to Underground Mining at the Munro Mine

    By Gordon W. Parsons, Ross E. Sampson

    "THIS PAPER will trace the work done in bringing the Munro underground ""A"" •Orebody into production to replace the open pit, which was scheduled to be completed early in 1959. Included will be an ou

    Jan 1, 1960

  • ISEE
    Conversion from Two-Pass Overburden Removal to Cast Blasting at Simplot Phosphates

    By Dale Preece, Steven Case, Cassidy McAllister

    Simplot Phosphates produces high quality phosphate fertilizer through open pit mining. The operation near Vernal, UT began as a three-pass mining process carried out with drill and blast followed by t

    Jan 1, 2012