Search Documents

  • DFI
    Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR

    By Vince Luongo

    "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project

    Jan 1, 2006

  • SME
    Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CA

    By Jeremy Theys

    The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • SME
    Construction Of Explosion Resistant Seals – Preprint 97-83

    By C. R. Stephan

    Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations

    Feb 24, 1997

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • ISEE
    Construction of Free Faces in a Single Event

    By Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro

    Jan 26, 2026

  • SME
    Construction Of Geological Controls For Three Dimensional Orebody Modeling

    By F. Daviess

    A requirement for geological controls during orebody modeling results from the recognition of heterogeneous geological characteristics and/or abrupt variations in orebody geometries. While purely stat

    Jan 1, 1992

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948

  • SME
    Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

    By Jamal Rostami, Ataollah Rahbar

    "Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a

    Jan 1, 2016

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • SME
    Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking

    By Peter van Dijk, Gary Almeraris, Philip Rice

    This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A

    Jan 1, 2001

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • SME
    Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area

    By Rudy Scarabelli, John R. Wagner

    At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th

    Jan 1, 1987

  • SME
    Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project

    By S. Holtermann

    Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983