Search Documents

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AIME
    Construction and Operation of a Cable Bert Conveying System at Twin Buttes

    By Fred B. Brost

    In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower mine to Twin Buttes. The system, supplied and installed by Cable Belt Ltd., of E

    Jan 12, 1979

  • SME
    Construction And Operation Of A Series Of Biological Leaching Tests Dumps

    By A. Bruynesteyn

    Many papers 'have been publihed on the role of the bacterium.Thiobacillus ferrooxidans in the oxidation of reduced sulfur compounds, and years of research have established the following environme

    Jan 1, 1972

  • SME
    Construction And Operation Of An Innovative Long Distance Conveying System At Twin Buttes

    By F. Brost

    In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower Partnership Mine to Twin Buttes. The system, supplied and installed by Cable Bel

    Jan 1, 1979

  • NIOSH
    Construction And Preliminary Evaluation Of A Die El Exhaust Particulate Filter For Underground Use

    By Robert W. Freedman

    In the Bureau of Mines study, a filter with a 20-by 20-inch-square cross section was inserted into the exhaust ducting of a 4-stroke-cycle, 90-hp diesel engine, and the efficiency of removal of total

    Jan 1, 1979

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • NIOSH
    Construction And Testing Of A Junk Auto Incinerator

    By C. J. Chindgren

    A refractory-lined, garage-type automobile incinerator with a natural gas afterburner for air pollution control was cooperatively constructed and tested by the Bureau of Mines and the Wasatch Metal &

    Jan 1, 1970

  • DFI
    Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer

    By C. Dai, S Raathiv

    The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th

    Nov 1, 2022

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • SME
    Construction Control Instrumentation Used During Tunnel Enlargement

    By Raymond P. Miller, David L. Monson, Robert A. Robinson

    A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p

    Jan 1, 1976

  • AUSIMM
    Construction Costs

    By Cerutty L

    To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat

    Jan 1, 1922

  • SME
    Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat Exchangers

    By W. Zitz

    Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t

    Jan 1, 2011

  • SME
    Construction Management Saves Time, Money and Improves Quality During Design and Construction

    By Behrouz Tehrani

    The size, complex issues, and requirements to construct large number of tunnels, for a single project, expeditiously, and without exceeding the overall project budget, a program Construction Managemen

    Jan 1, 2008

  • AIME
    Construction Materials – Aggregates-Introduction

    By Henry N. McCarl

    [The Construction Materials section contains the following Chapters: Aggregates Cement and Cement Raw Materials Crushed Stone Dimension and Cut Stone Lightweight Aggregates Gypsum and Anhydrite Sa

    Jan 1, 1983

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • SAIMM
    Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water Intersection

    By M. F. Wells

    The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w

    Jan 1, 1999

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003