Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation ? SynopsisBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for an expansion of the operations. A traditional net present value project valuation methodology had been used th
Jan 1, 2013
-
Case Study on the Application of Research to Operations—Calcium Ferrite SlagsBy Stanko Nikolic
The Top Submerged Lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. TSL technology for continuous converting was first patented in the 1990
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct VegetationBy N Currey, G W. Wilson, P Ritchie
Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera
Jan 1, 2003
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014
-
Case Study – Blind Shaft Sinking for BHP Jansen ProjectBy Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn
"The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with
Jan 1, 2019
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level caveBy P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018
-
Case Study – PVC Ventilation Duct Road Map from Product Development to Ventilating Underground Mining OperationBy A. Rai
"This paper provides an overview of the current use of auxiliary ventilation product and the challenges with limited air quantity in dead-end entry or working face. The PVC low frictional factor, low
Jan 1, 2015
-
Case Study – PVC Ventilation Duct Ventilating Underground Mining OperationBy T. Weatherwax, A. Rai, J. Poor
"This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,
Jan 1, 2016
-
Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä MineBy K. Huttu, A. van Wageningen
"The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern
Jan 1, 2015
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel MineBy J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Case Study: Advantages of High Rate Thickening at TISCO Jianshan Iron MineBy T. Gong
Often plans to increase plant throughput provide an opportunity for optimising plant equipment and operating methods. This was the case in 2005 at TISCO Jianshan Iron Mine, when an increase in product
Jan 1, 2014
-
Case Study: Blasting with Air Decks to Maintain Performance While Saving CostsBy Brian Lewis, Reinhold Daykin Schnell
Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos
Feb 6, 2023
-
Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013By A. Jennings, J. Cornet, P. Perrone
Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi
Jan 1, 2013
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Case Study: High Capacity Spiral ConcentratorsSpiral concentrators are compact, cost-effective and generally efficient gravity concentration separators for a wide range of applications (for example: coal, beach sands, iron ore, chromite and tanta
Jan 1, 2010