Search Documents

  • AIME
    Case Examples of Blasting Damage and its Influence on Slope Stability

    By Roger Holmberg, Kenneth Mäki

    This paper describe; open pit studies where blasting damage introduced in the remaining rock has been investigated. Results from two open pit mines are described and discussed. Parallel performed labo

    Jan 1, 1983

  • ISEE
    Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot

    By Gabsoo Kim, Rulin Yang, Dave Kay

    Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be

    Jan 1, 2014

  • AUSIMM
    Case Examples of Stability on Surface Mining Projects

    Stability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go

    Jan 1, 1986

  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Case Histories Of Geo-Column? Foundations - Synopsis

    By Osamu Taki

    This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl

    Jan 1, 2000

  • AUSIMM
    Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo

    By Wright R. J

    The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a th

    Jan 1, 1981

  • SME
    Case Histories of Rehabilitation of French Railway Tunnels

    By Verya Nasri

    This paper presents analysis of damages and rehabilitation design for three major French rail-way tunnels built in mid-19th century. The La Nerthe tunnel underwent ovalization deformation with excessi

    Jan 1, 2008

  • SME
    Case Histories of the Application of the STG Integrated Grouting Method

    By Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams

    The integrated grouting method, as developed in the USSR, can be applied to multi-purpose operations that in¬clude the construction of shafts, drifts, and tunnels. In the USSR it has been used extensi

    Jan 1, 1993

  • DFI
    Case Histories On The Applications Of Colloidal Silica For Permeation Grouting

    By Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden

    Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject

    May 1, 2022

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • CIM
    Case History of a Gravity Drainage Type Reservoir

    By R. E. Martin

    "The Westerose Leduc (D-3) pool, a Devonian reef reservoir situated in Central Alberta, Canada, has now been producing for over seven years. As a unit operation, the pool pro-vides an interesting exam

    Jan 1, 1960

  • SME
    Case History of a Mixed Ground Microtunnel

    By D. Craig Camp

    conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT

    Jan 1, 2001

  • CIM
    Case history of Borehole Pulse EM surveys at the Falconbridge Lindsley discovery in Sudbury

    By D. Crone, T. Watts

    "The Lindsley project was a program of deep drilling to test the contact down-dip from two nickel-copper deposits, one uneconomical and the other mined out. The role of Borehole Pulse EM(PEM) was to d

    Jan 1, 1992

  • CIM
    Case History of Gold Discovery Eastmain River Area, Quebec

    By C. Hilgendorf, J. Gingerich, J. R. Boniwell, M. Drouin, D. David on, J. Boldy

    The initial discovery of gold in the Eastmain River area, 310 km northeast of Chibougamau, was made by Placer Development Limited in 1970. This discovery resulted from the drill testing of an airborne

    Jan 1, 1984

  • CIM
    Case History of Lost Circulation Jobs Leduc-Woodbend Field, Alberta

    By H. F. Naldrett

    "AbstractAt the end of May, 1950, Imperial Oil, Limited, had completed a total of 192 D-3 wells in the Leduc-Woodbend field, 62 of which lost circulation in the D-3 zone for periods ranging from two h

    Jan 1, 1950