Search Documents

  • SME
    Blind Drilling A 3-Meter (10-Foot) Diameter Shaft To The Deep Saline Oil Shale Zone In NW Colorado

    By R. W. Amstutz

    Abstract. The shaft was drilled on U.S. Government land in the Piceance Creek Basin and was funded by the U.S. Bureau of Mines. It was drilled to 723 meters (2 371') to provide access to rich dep

    Jan 1, 1980

  • CIM
    Blind drilling for shaft development

    By James H. Cobbs

    Blind boring of shafts is becoming an increasingly important part of shaft sinking. Blind-bored shafts have reached diameters of 25 It in Europe and 16-1/2 ft in the United States. Much of the technol

    Jan 1, 1979

  • TMS
    Blister Flash Smelting - Efficient And Flexible Low-Cost Continuous Copper Process

    By Jukka Tuominen

    The history of making blister copper in an Outokumpu Flash Smelting Furnace dates back to the late 1960?s, when Outokumpu first piloted the Outokumpu Direct Blister (ODB) process. The first commercial

    Jan 1, 2005

  • SME
    Blizzard fails to keep 7,202 away from SME Annual Meeting in Denver, CO

    One of the critical challenges facing the mining industry ? and not just in the United States ? is the looming labor shortage. A significant percentage of the industry?s professional workforce is, wel

    Jun 1, 2013

  • DFI
    Block 43: Diverse Technologies in Complex Site Conditions

    By John Kvinsland

    "The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc

    Jan 1, 2014

  • AUSIMM
    Block Cave Evaluation

    By R J. Butcher

    Many deposits have been evaluated as potential block caves over the last 20 years due to the perceived benefit of low operating costs. However, block cave projects are typically capital intensive, wit

    May 9, 2016

  • SME
    Block Cave Production Scheduling Using PCBC

    By T. Diering

    Gemcom PCBCTM is a software package which has been developed over the last 22 years for the planning and scheduling of block cave mines. This paper presents an update of the various research and devel

    Jan 1, 2010

  • AUSIMM
    Block Cave Undercutting - Aims, Strategies, Methods and Management

    Many block caving operations experience difficulties during undercutting, resulting in draw horizon damage, production loss and extensive drift repairs for the life of the block cave. This paper deals

    Jan 1, 2000

  • AIME
    Block Caving

    By Philip B. Bucky

    [ ]

    Jan 1, 1942

  • AUSIMM
    Block Caving - Controllable Risks and Fatal Flaws

    Block caving is the lowest cost underground mining method but it has relatively high risks and a high up-front capital and development cost. It has application to large, often lower-grade orebodies wh

    Jan 1, 2000

  • AIME
    Block Caving - New York Meeting February 1941

    By Philip B. Bucky

    [CONTENTS t. How Does One Determine WhetherPAGE an ore Body Will Block-cave?R. W. Hughes13 Sherman R. Burdick 13 PAGER. T. Gallagher 14 Mark A. Smith 2 C. F. B. Price, Jr.14 Harry A. Leidich2Be

    Jan 1, 1942

  • AIME
    Block Caving at King-Beaver Mine

    By A. H. Underwood, M. –Ls. Trépanier

    INTRODUCTION The King and Beaver mines of Asbestos Corporation Limited (ACL) were joined in 1957 to form the King-Beaver mine. In 1964, ACL purchased the Johnson's Asbestos Company. The combi

    Jan 1, 1981

  • AIME
    Block Caving Practice At The Jeffrey Mine

    BLOCK CAVING HAS BEEN DEVELOPED to a high degree of efficiency in the last two decades and more particularly since World War II. At the Jeffrey mine of Canadian Johns-Manville Co., in the Eastern Town

    Jan 5, 1954

  • SME
    Block Craving - General Description

    By Ray L. Tobie, Douglas E. Julin

    GENERAL DESCRIPTION Block caving is a distinct caving method applied mostly to large, massive, ore bodies because of its in¬herent low cost and high production capabilities. Areas of sufficient siz

    Jan 1, 1982

  • AUSIMM
    Block Model Data Reduction and Sensitivity Analysis

    By J E. Everett

    Maximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, e

    Jul 13, 2015

  • SAIMM
    Block Size Selection And Its Impact On Open-Pit Design And Mine Planning

    By R. M. Jara

    This work evaluates and characterizes the impact of the support size and mining dilution of a block model in the operation and selection of equipment at an open pit mine. An exploratory analysis and g

    Jan 1, 2006

  • CIM
    Block Stability Analysis of Left Bank Slope of Beihetan Hydropower Station in Jinshajiang River, China

    By G. Rong, W. Du

    Stability of some potential unstable blocks in the left bank slope of Baihetan hydropower station is evaluated in this paper using the three-dimensional (3D) limit equilibrium method. The Baihetan hyd

    Jan 1, 2015

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • SME
    Blockchain Technology and Mining Industry: A Review - Mining, Metallurgy & Exploration (2023)

    By Ankit Jha, Javad Sattarvand, Aaron Young

    Blockchains are one of the prominent disruptive technologies that are being implemented in several disciplines. The application of blockchains in the mining and mineral industry can provide utility fo

    Nov 23, 2023

  • SME
    Blockchain technology and the mining industry: A review

    By Ankit Jha, Javad Sattarvand, Aaron Young

    Blockchain technology is one of the prominent disruptive technologies that are being implemented in several disciplines. The application of blockchains in the mining and mineral industry can provide u

    Mar 1, 2024