Search Documents

  • SME
    Long Range Planning at Chuquicamata Mine

    By Juan P. Camus, Sergio G. Jarpa

    INTRODUCTION Chuquicamata mine is a large copper open pit located in the north of Chile. It has been in production for more than 80 years and now is in the later stages of its life with declining

    Jan 1, 1996

  • AUSIMM
    Long Range Planning at SEPG Twin Creeks Mine for the Sulphide Plant Study

    By Casale G

    This paper discusses a long range mine plan development at the Santa Fe Pacific Gold Twin Creeks Mine based on the reserves of Mega pit. The key constraints of the schedule development included two

    Jan 1, 1995

  • SME
    Long Range Supply And Demand For Nonmetallic Industrial Minerals

    By James D. Cooper

    Long range projections of demand for nonmetallic minerals are presented, together with data on the domestic resources which are available or which can be made available to meet the requirements throug

    Jan 1, 1969

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • DFI
    Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985

    By Donald J. Murphy

    Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in

    Jan 1, 1986

  • SME
    Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the Netherlands

    By M. van Elp, R. Saitua Nistal, P. J. M. Groot

    Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i

    Jan 1, 2011

  • DFI
    Long Term Performance of Grouts and the Effects of Grout By-Products

    By Stephan A. Jefferis

    I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the

    Feb 10, 2003

  • AIME
    Long Term Prediction Of Coal Cleaning Performance From Exploration Samples (2c518805-efbc-4cd7-9ab8-f89969fea385)

    By Joseph W. Leonard

    In a recent publication in the SME Transactions of September, 1975, Volume 258, entitled “Potential for Further Lowering Sulfur in Intensively Cleaned Coal at Mines,” the writer discussed: (1) technic

    Jan 1, 1979

  • AUSIMM
    Long Term Structural Issues in the Mining and Metals Industries

    By Blight P

    There is today widespread concern about the future of the mining industry. In attempting to understand the underlying causes the paper probes in some detail, the long term structural changes affec

    Jan 1, 1986

  • AUSIMM
    Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project

    By Griffiths J. B

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices

    Jan 1, 1981

  • AUSIMM
    Long-Hole Directional Drilling Applications at Huntly West Mine, New Zealand

    By D Vickers, N C. Fowke

    The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge

    Jan 1, 1991

  • AIME
    Long-Hole Mining Methods - Diamond-drill Blast Holes in a Magnetite Ore Body ( T.P. 1899,

    By Robert J. Linney

    In the latter part of the year 1943, it was decided to experiment with diamond-drill blast holes in the Old Bed magnetite mine at the Mineville mines of the Republic Steel Corporation, in sections of

    Jan 1, 1946

  • AIME
    Long-Hole Mining Methods - The New Horadiam Method of Mining at Copper Mountain (T. P. 1914, Mining Tech., Sept. 1945).

    By C. H. Brehaut, W. N. Taylor, R. S. Douglas, H. A. Shannon

    The name for this new method of mining is derived from a composition of Horizontal, Radial, Diamond, and the drilling is from raises. This method, worked out at Copper Mountain, B.C., is believed to b

    Jan 1, 1946

  • AUSIMM
    Long-hole raising At The CSA Mine, Cobar

    By Haskard R. W

    A method of raising has been developed at Cobar Mines Pty Ltd's CSA Mine which has achieved advance of up to 6 m in a single blast and raises are now developed which have averaged 4.2 m per b

    Jan 1, 1983

  • SME
    Long-Range Hydrophobic Forces In The Amine Flotation Of Quartz

    A Mark IV surface force apparatus (SFA) was used to conduct direct force measurements between mica surfaces in dodecylamine hydrogen chloride collector solutions at varying pH levels. It was found tha

    Jan 1, 1998

  • SME
    Long-Range Planning Commission - Report of the Educational Activities Committee

    By Thomas V. Falkie, Howard L. Hartman, Bruce R. Palmer, Donald W. Gentry, John E. Frost, Peter T. Luckie, Michael K. McCarter, Lee W. Saperstein

    Education in the mineral engineering professions is in the same flux and turmoil as is the entire minerals industry. Overcapacity in some areas, undercapacity in others, and the constant fear of subst

    Jan 6, 1984

  • SME
    Long-Range Planning Commission - Report of the Management and Organization Committee

    By A. Tobey Yu, W. Joseph Schlitt, Alfred Weiss, Frederic L. Kadey, Louis Kuchinic

    Introduction The February and April 1984 issues of MINING ENGINEERING have already provided introduction to the long-range planning efforts of the Society of Mining Engineers (SME). These efforts are

    Jan 6, 1984

  • SME
    Long-Range Planning Commission: Report of the Scope Committee

    By Charles C. Dahl, Gordon C. Presley, Andrew E. Nevin, Bruce A. Kennedy

    How does SME-AIME cope with profound changes in technology, markets - and most importantly - in employment patterns facing its membership today? This is the question that prompted the Society's B

    Jan 4, 1984

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996