Search Documents

  • AIME
    Kasai Diamond Fields of the Belgian Congo

    By A. E. Brugger

    SOME 2,000 years ago Pliny is supposed to have said, "Out of Africa always something new." It may perhaps even now be news to a great many that the Belgian Congo has in recent years been producing app

    Jan 1, 1932

  • SME
    Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022

    By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley

    Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t

    Dec 1, 2022

  • ISEE
    Keeping Airblasts Under Control

    By Jaak J. K Daemen, Clayton R. Morlock

    A study was performed to evaluate the predictability of airblast overpressures induces by production mine blasting. Thirty-seven production blasts were monitored using 3 blasting seismographs giving o

    Jan 1, 1983

  • SME
    Keeping an Eye on Safety Improves the Bottom Line

    By Steve Kral

    Worker safety is an issue that transcends industries, whether it be mining, construction, manufacturing or even general office work. In the mining industry, safety and training are particularly impor

    Jan 1, 2003

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • SME
    Keeping It Focused: Conference Reflects On A Year Of Prudent Growth

    Despite two large projects represented in the keynote docket, the mood of the 2011 SME Arizona Conference was summed up best by Ferol Baker, general manager of New Mexico Copper Corp. (a wholly owned

    Jan 1, 2012

  • AUSIMM
    Keeping the Lights On! High Risk Blasting at Boddington Gold Mine

    By D Rubery, C Croker

    The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine

    Jan 1, 2002

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018

  • AUSIMM
    Kelian Case Study

    By Barlow S

    The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl

    Jan 1, 1997

  • SAIMM
    Kell Hydrometallurgical Extraction of Precious and Base Metals from Flotation Concentrates – Piloting, Engineering, and Implementation Advances

    By K. S. Liddell, L. A. Smith

    "Kell is a hydrometallurgical treatment option for the recovery of platinum group metals (PGMs), gold, silver, and base metals from flotation concentrates to refined products on site. The process is c

    Jun 1, 2019

  • SAIMM
    Kell Hydrometallurgical Process For Extraction Of Platinum Group Metals And Base Metals From Flotation Concentrates ? Synopsis

    By K. S. Liddell

    The Kell Process has been developed for the extraction of platinum group metals (PGMs) and base metals from sulphide flotation concentrates. The process has been successfully tested on several differe

    Jan 1, 2012

  • AUSIMM
    Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz Rejects

    By P V. A van der Westhuyzen

    Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min

    Oct 5, 2011

  • CIM
    Kemess North

    By Carl Edmunds

    Talk Outline Deposit?s Vital Statistics and Economic Environment Regional Geologic Setting Deposit Geology UBC Research Search Model and Current Exploration Plans Kemess Operations Kemess South

    May 1, 2006

  • CIM
    Kemess South Mine Closure and Reclamation

    By Georgia J. Lysay

    Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv

    May 1, 2011

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • SME
    Kennecott Celebrates Its Centennial

    On June 4, Kennecott Utah Copper (KUC)marked the centennial of the founding of the original company. Bill Champion is president and chief executive officer of KUC. He said, “What has happened during

    Jan 1, 2003

  • AIME
    Kennecott Copper Corporation - Ray Mines Division - Ray, Arizona

    Prospectors were digging silver in the Ray mine area in 1873, and by 1880 high-grade copper ore was feeding a 30-ton copper furnace. In 1910, D. C. Jackling and his associates organized the Ray Consol

    Jan 1, 1978

  • TMS
    Kennecott Flash Converting Furnace Design Improvements - 2001

    By C. J. Newman

    In January 1999, a redesign of the Kennecott Flash Converting furnace settler was initiated to enhance furnace integrity and extend furnace life. This furnace uses Kennecott-Outokumpu Flash Converting

    Jan 1, 2002

  • SME
    Kennecott Process For Recovery Of Copper, Nickel, Cobalt And Molybdenun From Ocean Nodules

    By Dr. Jagdish C. Agarwal

    Kennecott Copper Corporation has developed a new hydrometallurgical process for extracting nickel, copper, cobalt and molybdenum from maganese nodules. This process (KCC Cuprion Process) utilizes a re

    Jan 1, 1978

  • SME
    Kennecott Utah Copper Corporation Information Systems

    By Wayne Wride, Amy Lamb, Debra Sonntag

    In today's "information age", we have the ability to collect volumes of data about a company's performance. The challenge is to turn that data into information employees can understand and u

    Jan 1, 2000