Search Documents

  • SME
    Installation Of A State-Of-The-Art Ventilation Shaft At A New Mexico Coal Mine

    By A. Zeni, S. L. Bessinger, T. A. Palm

    San Juan Coal Company (SJCC) operates an underground coal mine near Farmington, New Mexico. Continuous miners and a longwall produce 7-8 million tons per year. The coal seam at SJCC has tested to

    Jan 1, 2006

  • SME
    Installation Of A Supervisory Control System At A Gold Pressure Oxidation Plant (edba5c85-6442-4bfd-bdfb-2b55fb328e40)

    By M. Spangler

    FirstMiss Gold installed a supervisory control system based on Pavilion Technology's Process Insights neural network software and Oil System's PI data historian. The primary goal of the syst

    Jan 1, 1995

  • SME
    Installation of a Ventilation Shaft at San Juan Coal

    By T. Arthur Palm, Stephen L. Bessinger

    San Juan Coal Co. (SJCC) operates an underground coal mine near Farmington, NM. Continuous miners and a longwall produce 6.3 to 7.2 Mt/a (7 million to 8 million stpy). SJCC is owned and operated by

    Jan 1, 2007

  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986

  • TMS
    Installation Of Arsenic Removal In The Hematite Process (c1cda2c1-a9fd-43db-8e83-1dd87fe69bec)

    By H. Masuda

    The lijima Zinc Refinery started operation in 1972, and has today an annual capacity of 200, 000+-Zn. The hematite process was employed for the first time and the ideal of waste-free refinery has been

    Jan 1, 2003

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • DFI
    Installation Of Drilled Piers In Shales ? Synopsis

    By A. C. Ackenhell

    The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of

    Jan 1, 2010

  • CIM
    Installation of Flash Flotation Units at the Louvicourt Concentrator

    By Bernard Dallaire, Jean Cayouette, Sylvain Duchesne

    "Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues

    Jan 1, 2001

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge (16c93b01-e1c3-48e5-bd32-54e8ea2106cb)

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2013

  • AUSIMM
    Installation of No 2 Gold Plant - Shotover River

    L&M have been involved on the Shotover since 1980 when we joined Jack and Barney Ryan, who had started in 1972 with gold at $45 per ounce after a successful career as roading and demolition contra

    Jan 1, 1985

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016