Search Documents

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • AUSIMM
    Golden Plateau and Adjacent Deposits Structural Controls on Mineralisation

    Structural Controls Interpretation of regional aeromagnetics, radiometrics and satellite image data has identified three structural domains (fig 2): The Fairyland Domain: a general N - S structural t

    Jan 1, 1990

  • SME
    Golden Sunlight - A New Gold Mining Operation

    By T. J. Smolik

    The Golden Sunlight Mine started full-scale operations in February 1983, with a conventional open-pit mine supplying 4464 tonnes (5000 tons) per day of milling ore. After crushing and grinding, the or

    Jan 1, 1984

  • CIM
    Goldex, the GRG Jewel

    By G. Belzil, F. Robichaud, M. Fullam

    "The Goldex mining and milling complex is operated by Agnico-Eagle Mines Ltd. and is located in the Abitibi greenstone belt of Northwest Quebec, Canada. The mill operates presently at a throughput of

    Jan 1, 2012

  • CIM
    Goldex, the GRG Jewel (f7d6adb6-5ccd-46eb-a997-fe635a7b545b)

    By G. Belzil, F. Robichaud, M. Fullam

    ABSTRACT The Goldex mining and milling complex is operated by Agnico-Eagle and is located in the Abitibi greenstone region of northwestern Quebec, Canada. Commercial production started in 2008. Averag

    Jan 1, 2013

  • AUSIMM
    Goldilocks – value of information for geoscience applied to coal in tactical time horizons

    By D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman

    Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th

    Mar 22, 2022

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • AUSIMM
    Good Coke from Low Rank Coal Blends

    By Hutchings SG, Skimmings T

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Good Data-A Requirement For A Good Reserve

    Quite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in

    Jan 1, 1979

  • AUSIMM
    Good Delay Timing-Prerequisite of Efficient Bench Blasts

    Variations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul

    Jan 1, 1977

  • AIME
    Good Music, Food and Short Speeches at Annual Dinner

    By AIME AIME

    WITH a brilliance undimmed by hard times, the annual dinner on Wednesday evening, Feb. 17, was a complete success. More than 600 members, friends and ladies gathered early and filled the anterooms of

    Jan 1, 1932

  • AIME
    Good Organization Is Making Records at the Hooper Tunnel

    By W. F. Boericke

    AT Kellogg, Idaho, J. Fred Johnson is driving the 5000.-ft Hooper Tunnel under contract for the Bunker Hill & Sullivan Mining Co. This was visited by a group of engineers during the recent meeting of

    Jan 1, 1930

  • AIME
    Good Practice in Combatting Dust Hazards Associated with Mining Operation

    By Donald Cummings

    CERTAIN dusts are dangerous when inhaled, but most hazardous of all dusts are quartz or other forms of pure crystalline silica. The inhalation of dusts containing silica in combination with other elem

    Jan 1, 1935

  • SME
    Good Times at Arizona Conference Are Tempered With Concerns For the Future

    By William M. Gleason

    When SME’s 2006 Arizona Conference convened in December at the Hilton El Conquistador Resort in Tucson, AZ, there was considerable excitement among the 387 attendees. There was a noticeable buzz s

    Jan 1, 2007

  • AUSIMM
    Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond deposit

    By C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner

    The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control

    Mar 22, 2022

  • NIOSH
    Goodbye, 'Minerals And Materials;' Hello, 'Minerals Today!'

    By Harold Kennedy

    Take a good look at this issue of Minerals and Materials. This is the last issue of M&M, as it has been known within the U.S. Bureau of Mines, that you will receive. Fifteen years after it was created

    Jan 1, 1989

  • SME
    Goodyear Unveils Two Piece Assembly for Mining Tires

    By Tim O’Neil

    Tire companies have historically used the mining industry as a platform to launch new technologies. And the mining industry has been receptive to that. So, while developing its Two Piece Assembly, Go

    Jan 1, 2003

  • IMMS
    Gorda Ridge And Mid-Atlantic Ridge: New Frontiers For Undersea Research

    By Peter A. Rona

    Investigations of the Gorda Ridge within the proclaimed U.S. Exclusive Economic Zone off northern California and southern Oregon, and the Mid-Atlantic Ridge extending along the center of the Atlantic

    Jan 1, 1988

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • SME
    Got Wet Or Dry? Get Mist Drilling.

    By Dan Armour

    Bolting solutions traditionally offered only wet drilling or dry drilling options; each with advantages and disadvantages. Joy Mining Machinery has developed a Mist Drilling System that incorporates t

    Jan 1, 2005