Search Documents

  • SME
    Geotechnical Investigations for Tunneling in Glacial Soils

    By David Chapman, Glen Frank

    Due to the transport mechanics of the depositional environment, glacial soils display a very wide range of grain sizes and behavior. Several nonstandard drilling, sampling, and analytical techniques a

    Jan 1, 2001

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • SME
    Geotechnical Modeling of Kinross – Round Mountain - Mining, Metallurgy & Exploration (2021)

    By John Keefner, Charles Kocsis, Kyle A. Scalise

    Geotechnical modeling of mines is crucial for understanding the many factors that can pose potential hazards or limit production opportunities. The process of back analyses for modeling is often used,

    May 24, 2021

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • SME-ICGCM
    Geotechnical Monitoring of Rock Mass and Support Behaviour around the UCG Georeactor: Two Case Studies in Polish Coal Mining Industry

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Sylwester Rajwa, Aleksander Wrana

    "Underground coal gasification (UCG) provides a solution to supply electricity from high ash coal or deep deposited seams. The coal is consumed in situ, and, accordingly, the ash is left underground.

    Jan 1, 2017

  • CIM
    Geotechnical monitoring of tunnel boring machine drivages at the Donkin-Morien Mine, Nova Scotia

    By T. R. C. Aston, C. M. K. Yuen, J. L. Gilby

    "The access tunnels for the Donkin-Morien Mine in Cape Breton, Nova Scotia, comprise two parallel tunnels driven through a sedimentary sequence of sandstone, siltstone and mudstone to intersect the Ha

    Jan 1, 1988

  • SAIMM
    Geotechnical parameters characteristics for a kind of schist in Iran

    By A. Fahimifar, H. Soroush

    Abstract: Triaxial tests were conducted on the schist specimens with various anisotropic angles under confining pressures of 0, 7 and 15 MPa, and axial stress-axial strains, were measured and plot

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME
    Geotechnical Program At Bridger Coal Company

    By H. Maleki

    Interwest Mining Company has been collecting geologic data within the last decade in preparation for underground mining of extensive coal reserves in its Bridger Coal property in southwestern Wyoming.

    Jan 1, 2008

  • SAIMM
    Geotechnical properties of the northern KwaZulu-Natal coastal sand dunes, South Africa

    By E. M. Bloomfield, C. A. Jermy

    Geotechnical tests were carried out within an area of the coastal sand dune cordon of northern KwaZulu-Natal which is currently being exploited through mining of heavy mineral sands. In situ and labor

    Jan 1, 2003

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • SAIMM
    Geotechnical risk assessment of an underground magnesite mine

    By T. Frömmer, H. Wagner

    An inter-disciplinary geotechnical study has been carried out in an Austrian magnesite mine. The paper describes the how geological data, in situ and laboratory tests as well as subjective, empirical,

    Jan 1, 2003

  • CIM
    Geotechnical Risks Affecting Pipelines - The Bolivia-Brazil Natural Gas Pipeline Experience

    By H. R. Oliveira, C. R. Aragonez de Vasconcellos

    Pipeline operation and maintenance necessarily involves geotechnical studies at points and areas with deflagrated instabilities or still to map and monitor areas prone to geotechnical problems. Landsl

    Jan 1, 2005

  • AUSIMM
    Geotechnical Shaft Reconciliation at Oyu Tolgoi, Mongolia

    By A Purvee, M F. Lee, L J. Mollison

    Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish

    Jan 1, 2008

  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • SME
    Geotechnical Software Evolution And Integration, A Perfect Fit For Mine Monitoring

    By J. Tavares

    It is no mystery why the mining industry has such lofty safety standards. In dealing with Mother Nature and gravity, the combination of the two can create significant hazards from high wall and tunne

    Feb 23, 2014

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018