Search Documents

  • CIM
    Forum on "Ball Mills Using Steel Vs. Pebble Mills

    By J. M. Hemstock, H. L. Ames

    THESE forums have been held annually since they were introduced by Mr. L. E. Djingheuzian in 1957. The response of millmen to questionnaires such as the one this year is ample evidence of the interest

    Jan 1, 1961

  • CIM
    Forum on Ball and Rod Mill Liners

    By W. H. Zieman

    "THIS IS THE THIRD of the consecutive Annual Forums on Grinding that were instituted by Mr. L. E. Djingheuzian in 1957. The first was on the subject of Ball Milling (Transactions, Volume LX, 1957) and

    Jan 1, 1959

  • CIM
    Forum on Ball Milling

    MR. J. F. MYERS, Consulting J3eneficiation Engineer, Greenwich, Conn.: In the written discussion contributed by Mr. F. C. Bond in item ( 2) (page 515), speaiking about the significance of the ratio of

    Jan 1, 1957

  • AIME
    Forum On Open Pit Mining - Tungsten Carbide Bits for Blockholing at Ajo

    By ALFRED T. BARR

    In certain areas of the New Cornelia pit, considerable secondary blasting is necessary to reduce oversized boulders, formed from primary blasting, to pieces which will pass the 41/2-cu yd dippers on t

    Jan 1, 1949

  • CIM
    Forum on Rod and Ball Mill Liners

    By W. H. Zieman

    NORMAN WEISS, Milling Engineer, American Smelting• and Refining Company: The subject of the Forum on Rod and Ball Mill Liners is very fascinating, and there is no end of discussion when operators get

    Jan 1, 1959

  • CIM
    Forum on the Non-Cataracting Ball Mill

    By L. E. Djingheuzian

    ANON-CATARACTING (N-C) ball mill is so operated that the balls are not thrown in-ward at the top of their paths. The result is to maintain, in the mill, a quiescent pool in which classification will o

    Jan 1, 1958

  • AUSIMM
    Forum: The Role of Government Departments in the Minerals Industry

    I am wearing two hats today. When the invitations went out to participate in this forum, two were received in the head office of the Department of Lands and Survey - one addressed to the Director-Gene

    Jan 1, 1976

  • CIM
    Forward Osmosis for Industrial Process Water Recovery: The Case of TMA-CO2-H2O as Draw Solution

    By V. G. Papangelakis, T. Clark, G. Kolliopoulos

    Sustainability of the hydrometallurgical industry requires the development of processes for effective water recovery; if process water is recovered and recycled, fresh water intakes will be reduced. F

    Jan 1, 2015

  • SME
    Foskor Phosphate Beneficiation

    By Charles Schmidt

    Phalabonva (Figure 1) is situated in the northern province of South Africa adjacent to Kruger National Park, about 500 km from Johannesburg. The nearest South African port to Phalaborwa is Richards Ba

    Jan 1, 1999

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Fosterville gold mine – breaking the mould for Victorian gold

    By N Phillips

    Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d

    Sep 20, 2017

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' Operation

    By Michel Bustamante

    The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w

    Jan 1, 2002

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    Foundation Design And Construction Challenges For The Phoenix Sky Train Project

    By John C. Niedzielski

    The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill

    Jan 1, 2010

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • CIM
    Foundation for rapidly expanding material handling facilities

    By K. Law

    "The Hatch Product Transport (HPT) system is a highly flexible and configurable route selection and sequencing system for controlling large bulk material handling facilities. The system has a generic

    Jan 1, 2006