Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement PlotsBy Lenin T., Madhav M. R., Padmavathi V.
Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging
Sep 1, 2022
-
Estimation of Critical Distances to Avoid Failures in Detonators by Dynamic Pressure.By Lizbeth A. Escobar, Phol M. Llanos, Maritza Y. Avila
The present research develops the estimation of critical parameters such as the distances and times between holes to avoid failure due to dynamic pressure in electronic detonators based on the near-fi
Feb 1, 2020
-
Estimation of diesel particulate concentrations in underground mines (Technical Paper)By G. P. Saseen, R. A. Haney
The US Mine Safety and Health Administration (MSHA) developed a model to estimate diesel particu¬late (dp) exposures in underground mines. The estimator uses in-mine measured dp concentrations or engi
Jan 1, 2000
-
Estimation of Fe grade at an ore deposit using extreme gradient boosting trees (XGBoost)By Firat Atalay
Estimating the spatial distribution of ore grade is one of the most critical steps to proceed with an investment decision on a deposit. Kriging is the most widely used method to estimate the ore grade
Dec 1, 2024
-
Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"By Kwangmin Kim, Junnhyeok Park
In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used
May 16, 2020
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge MethodBy Jogeshwar P. Singh, Mohamed Ashour
The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio
Jan 1, 2015
-
Estimation of Future Ground Vibration Levels in Malmberget Town Due to Mining-Induced Seismic ActivityBy T. Wettainen
Malmberget town is located in northern Sweden, approximately 70 km north of the Arctic Circle. Parts of the town overlie more than 20 iron orebodies, consisting mainly of magnetite with smaller quanti
Jan 1, 2014
-
Estimation Of Gold Ore Reserves At Mt. Charlotte, Kalgoorle, Western AustraliaGold occurs at Mt. Charlotte associated with a stockwork of pyritised quartz veins in Unit 8 of the Golden Mile Dolerite. The ore- body is massive, 200m long and 40m wide and has been proved to over
Jan 1, 1979
-
Estimation of Grinding Time for Desired Particle Size Distributionand for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and ExplorationBy Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa
Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses
-
Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSWBy Schofield N. A
The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high
Jan 1, 1993
-
Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in CanadaBy D. J. Farmer
Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasi
Jan 1, 1997
-
Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case StudyBy Zhiye Zhao, Jianping Sun, Zhipeng Xu
"The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of
Jan 1, 2015
-
Estimation of in-situ material strengthBy Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
Estimation of Iron Ore Resources Integrating Diamond and Percussion DrillholesBy Jacques Deraisme
The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be
Oct 1, 2009
-
Estimation of joint behaviour by monitoring and analysis in the rock cavernBy T. Maejima, K. Aoki, T. Mori, K. Iwano
Concerning the excavation of rock cavern, it is one of the most important issues to evaluate the behavior of rock joints. But few detailed measurements for joint behavior had been conducted. Therefor
Jan 1, 2003
-
Estimation of large open pit haulage truck requirementsBy G. H. Blackwell
Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement
Jan 1, 1999
-
Estimation of Lateritic-Type OrebodiesBy A. G. Journel, CH. Huijbregts
"Centre de Morphologie MathématiqueSpecial problems arise in the evaluation of lateritic-type orebodies (Ni-Co, bauxite) or, more generally, orebodies affected by surface weathering. In this type of o
Jan 1, 2014
-
Estimation of leakage in ventilation ductingBy G. Auld
"A simple method is presented whereby the additional quantity and static pressure necessary to compensate for ventilation duct leakage may be estimated using the circular reference functions of modern