Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry
Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel
Jun 13, 2021
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
Updating the GBR Gold Book - NAT2022By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021By Herman Gill, Dani Delaloye, Madelyn Rubin
The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horsesho
Jun 13, 2021
-
Innovative Approach for Dust Control in Tunnel Construction - NAT2022By Craig Allan
Underground construction environments, especially those with limited airflow such as shafts, cross passages, and stations, necessitate effective dust control. This requires combining existing measures
Dec 1, 2022
-
Technical Note - Physical influences on Atkinson's friction factorBy J. A. Procarione
Introduction Ventilation engineers have always felt somewhat uneasy when, in the normal course of their work, they are forced to consider the flow in any mine entry as "wholly rough." Under such c
Jan 1, 1988
-
Mineral Development And Land Conservation In Montana's Stillwater District (bc9f553c-0466-42ef-bf85-39ee5c04a836)By Timothy C. Richmond
The Stillwater District is located in south central Montana approximately 75 miles southwest of Billings, the state's largest city. It lies along the northeast front of the Beartooth Mountains an
Jan 1, 1974
-
Investing in Sustainable Tailings Management: Reduce Risk by Considering Environmental and Utility Costs During Pre-Feasibility - SME Annual Meeting 2024By Jacob Bouke, Jason Janisch, Erik Vlot
The use of conventional tailings deposition methods has been the standard for decades. With the need to reduce the impact of mining, alternative methods are considered when expanding or upgrading tail
Feb 1, 2024
-
Cobalt Recovery from Mill Tailings at Mantoverde Copper Mine - SME Annual Meeting 2025By Peter Amelunxen, Kain Nugent, Brandon Akerstrom, Willem Duyvesteyn, Todd Harvey
In 2024, Capstone Copper Corp commissioned a new sulfide flotation plant at Mantoverde in the Atacama region of Chile to process copper ore at a design rate of 32,000tpd. The pyrite associated with th
Feb 1, 2025
-
Hierarchical Training Pipeline for Event-Based Robotic Perception Models for Autonomous Roof Bolting - SME Annual Meeting 2024By Akram Marseet, Andrew J. Petruska, Rik Banerjee
Event cameras are used for their performance in high dynamic-range lighting conditions which are canonical to active mining environments. Direct labeling of event-based image data to train a model to
Feb 1, 2024
-
Downstream Improvements on Upstream Dams: An Owner’s Perspective of a Paradigm Shift - SME Annual Meeting 2024By Christopher R. Winter
Mining companies have sharpened their refocus on their tailings management strategies in recent years. Mining companies with tailings storage facilities that use the upstream construction method have
Feb 1, 2024
-
Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara
The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th
Jun 23, 2024
-
Developing a Smart Evacuation System for Underground Mines Considering Human FactorsBy J. Sattarvand, P. C. Augustine
Despite significant safety improvements, the mining industry remains one of the most hazardous occupations globally and the evacuation of Miners, when an uncontrollable incident occurs in the mine, is
Jun 25, 2023
-
Machine Learning Driven Domain Modeling for Stratigraphic DepositsBy Carlos Fonseca, Gustavo Usero, Roberto Mentzingen Rolo, Gabriel Moreira, Octavio Rosa de Almeida Guimarães
Geological domain modeling is an important step in mineral resources evaluation. The procedure can be laborious and time-consuming, especially in multivariate settings. However, estimates are signific
Jun 25, 2023
-
Thermodynamic and Kinetic Study for Silver Recovery by Electrocoagulation Process - Mining, Metallurgy & Exploration (2022)By Víctor Vázquez, Guillermo Tiburcio, Martin Encinas, Jesús L. Valenzuela, Erick Montaño, Alejandro Valenzuela, José Parga
Merrill-Crowe is the primary process used for the concentration and purification of silver in a cyanide solution. The Langmuir Adsorption model for silver recovery in a cyanide solution was used for t
Oct 30, 2021
-
Transition and Optimization of the Henderson Mine Ventilation System (Mining, Metallurgy & Exploration)By C Rutter, N Shea, K Kolobe
The Henderson mine, a panel cave mine in Colorado, has undergone multiple ventilation system changes to meet dynamic airflow needs. This paper explains the ventilation designs for different production
Mar 2, 2022
-
Scaling and Flow Similarity Considerations to Develop a 1/40th Scale Aerodynamic Model of a Longwall Coal Mine for Methane Hazards InvestigationBy A. Juganda, H. PINHEIRO, J. Brune, N. SANDOVAL, G. Bogin, K. Gallagher, F Wilson
The present work discusses the nuances of scaling and flow similarity to develop a 1/40th scale version of a longwall coal mine. Details on the geometric, kinematic, and dynamic scaling of the physica
Mar 19, 2022
-
Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023By Julia Herhold
The demand for sustainable and profitable/efficient projects within the tunneling and other underground engineering sectors grows rapidly. Construction tasks play a key role within the project conduct
Jun 13, 2023