Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Short Tunnels with Shallow CoverBy David Smith
Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact
Jan 1, 2005
-
Incorporating Indigenous Technologies Into Enhanced Stormwater, Erosion And Sediment Control SystemsBy R. C. Warner, L. Mills, S. D. Botts, M. Marticorena
The Antamina Mine is located in the mountainous region of the Ancash Department of Peru at an elevation of approximately 4200m.The 120 km main access road crosses the headwaters of numerous high-value
Jan 1, 2004
-
A CFD Analysis Of Air Flow Patterns In Face Area For Continous Miner Making A Right Turn CutBy V. K. Kollipara
Air flow patterns in the face area of a room-and-pillar mining are critical for understanding the dust dispersion characteristics and for developing engineering controls. SIUC has previously performed
Jan 1, 2012
-
Cross-Borehole Geophysical Probing For Site CharacterizationBy R. J. Lytle
INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to
Jan 1, 1979
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation MonitoringA series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Cat Tests 360-st 797 Truck, Upgrades Wheel LoadersCaterpillar’s 797 327-t (360-st) mining truck is currently being tested at the company’s proving facilities. Mine evaluations began in the second quarter. The unit will be commerically available in
Jan 1, 1999
-
Metallurgical Development And Design For The Pascua Lama ProjectBy R. A. Williams
The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is
Jan 1, 2001
-
Producing a GIS Based Multi Attribute Decision Making for Social and Environmental Sustainability Assessment in a Copper Mine in IranBy B. Farshadi, B. Asi, M. J. Habibian
"Dare-Zereshk deposit is one of the deposits supplies ore for Taft copper Complex in Iran Yazd province. This deposit is situated underneath a village the same name. Prior to mining activities, the vi
Jan 1, 2011
-
American steelmaking is becoming a market-oriented enterpriseBy Frank W. Luerssen
Introduction "Austerity" is perhaps an overly generous description of the past three years in the American steel industry. Steel plants operated at an average of only 57% of their capability in 1982-
Jan 6, 1985
-
Georgia Kaolin: Development of a Leading Industrial MineralBy R. J. Pruett
The Georgia kaolin district is the world’s largest producer of kaolin. Georgia production tripled from 2.87 Mt (3.17 million st) in 1968 to8.35 Mt (9.2 million st) in 1998. Development of the Georgia
Jan 1, 2000
-
Separation Chemistry In The Refining Of An Off-Grade Molybdenite Concentrate By Leaching With An Acid MixBy P. M. Prasad
Off-grade molybdenite concentrates, mainly derived from secondary sources as by-products of the processing of copper, uranium and tungsten ores, do not satisfy the purity requirements (percent MoS2) f
Jan 1, 2007
-
Coal 1986 - Underground miningContinued market pressure on the US coal industry was the overriding factor affecting developments in underground mining in 1986. An oversupply of coal in the spot market kept prices low throughout th
Jan 5, 1987
-
Mine PreplanningBy Christopher J. Bise
INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula
Jan 1, 1986
-
Using Steel Fibers to Reinforce Final Shotcrete LiningsBy Thomas Schwind, Pamela S. Moran
For short tunnels, a reinforced cast-in-place lining is not economical and shotcreteis a logical substitution. In the past, reinforced shotcrete linings have been constructed with lattice girders and
Jan 1, 2005
-
The Development Of Niger’s First Gold MineBy Robert Harris, David Duncan
The Samira Hill gold mine represents the first commercial gold project for the landlocked country of Niger in West Africa. It began production in October 2004 as the result of over 10 years of explora
Jan 1, 2005
-
Influence Of Nanoscale Roughness On Surface WettabilityBy S. C. Brown
A number of studies have suggested that microscale asperities enhance bubble-particle attachment efficiency; however, in practice the roughening of particulate surfaces can also lead to a decrease in
Jan 1, 2003
-
Operating speed assessments of underground mining equipmentBy J. P. Ducarme
Numerous fatal/nonfatal accidents involving underground workers struck by powered machinery occur yearly, with continuous miners and roof bolters involved in the majority of these accidents. In an att
Jan 3, 2010
-
Selecting and Using Large Walking Draglines for Deeper Overburden StrippingBy N. B. Pundari
Proper selection of large walking draglines, based on sound engineering principles and field experience, has not kept pace with the large capital expenditures needed to buy these stripping machines. T
Jan 4, 1981
-
Microcomputer Analysis Aids Continuous Mining Productivity at TanomaBy Scott G. Britton
Microcomputeranalysis has long been a technique for engineering professionals to improve the theoretical and practical design of continuous mining systems. Such work has been typically composed of mod
Jan 1, 1991
-
Mining Engineering – Shovel and Excavator SurveyBy Lane White
In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies
Jan 1, 1992