Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Blast Complaints and Impulsive Shock

    By K A. Broadhurst

    Over the years International Standards have produced and are continuing to work on documents related to damage from blasting and human exposure to whole-body mechanical vibration and repeated shock.

    Jan 1, 1988

  • ISEE
    Practical Application of Used Oils in the Manufacture of Bulk Explosives

    By Michael S. Stern, Gordon P. McDonald

    The increasing costs and problems associated with transporting and safely disposing of used engine oils from remote mine sites have caused mining companies to consider other ways to consume their used

    Jan 1, 1993

  • ISEE
    Air Blast - The Major Cause of Complaings from Blasting?: Its Monitoring and Possible Control

    By G Alan Foster

    This paper discusses the cause of air blast and modern techniques to reduce this at the source. In addition it raises the problem of their marked variability due to prevailing weather conditions and h

    Jan 1, 1975

  • ISEE
    Case Studies in the Application of Firing Time Optimization

    By Sharon K. Reamer, Yvan Sifre, Klaus-Gunter Hinzen

    "Three case studies are presented that illustrate the successful application of firing timeoptimization (hybrid modeling) in the quarry environment and for a construction site. In allcases, the method

    Jan 1, 1993

  • ISEE
    Explosives Sculpt at Crazy Horse

    By Paul Muehl, Roger Lawrence

    The massive sculpture taking place on Crazy Horse Mountain in the Black Hills of South Dakota, may Be the most unique application of precision blasting techniques in the world today, It is certainly t

    Jan 1, 1991

  • ISEE
    Computer-Aided Blast Fragmentation Prediction

    By G E. Exedaktylos, Y Zhou

    The complex and non-linear nature of blast fracturing has restricted common bract design primarily to empirical approaches. The code developed for this investigation simulates the pattern of interacti

    Jan 1, 1989

  • ISEE
    Controlled Sequential Blasting

    By E Emery Jr Gray

    A need for more delay periods other than those normally manufactured throughout the explosives industry rarely occurs. This paper will discuss one such incident from an analytical view through practic

    Jan 1, 1976

  • ISEE
    The Renovation of Theodore Roosevelt Dam

    By Tom Hanke, Joe Strobbe

    The 80 year old Theodore Roosevelt Dam built in a scenic canyon near Globe, Arizona is currently undergoing a major renovation. The old stone dam, built by hundreds of skilled stonemasons, is being co

    Jan 1, 1993

  • ISEE
    Presplitting and Collapsing Part of an Old Underground Room and Pillar Mine

    By Dennis Dobson, Keith M. Henderson

    Lone Star Industries, Inc. in Cape Girardeau, Missouri operates an open pit mine to produce limestone for its portland cement manufacturing plant. The present mining method, for safety and legal reaso

    Jan 1, 1997

  • ISEE
    Vibration and Ground Rupture Criteria for Buried Pipelines

    By Lewis L. Oriard

    This paper describes the process of developing blasting specifications for 850 miles of new pipe trench running parallel to an existing high-pressure gas pipeline, often with as little as 14 ft to the

    Jan 1, 1994

  • ISEE
    Supression of Blast Pressure and Noise from Implosive Type Connectors

    By Ettore Contestabile, Cameron Thomas

    Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other

    Jan 1, 1995

  • ISEE
    Applications of Geophysical Wireline Logs to Blasting

    By E W. Kohler

    Geophysical wireline logging of blastholes provides useful geological data and has considerable potential to improve overall blasting control and costs. This paper uses case histories to show how logg

    Jan 1, 1988

  • ISEE
    Emulsion Comparison Tests

    By R W. Givens

    Comparison tests were performed on 6 emulsion concentrates, 3 microballoon sensitized emulsion concentrates, and 2 water gel concentrates from 8 different sources with ANFO used as a control standard.

    Jan 1, 1990

  • ISEE
    Cost Effective Loading of Large Diameter Pre-Split Holes

    By LaRay Collyer

    San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr

    Jan 1, 1990

  • ISEE
    Strategy, Innovation and Change - Challenging the Future at the Gregg River Mine

    By Rick W. Bellenie, Ronald L. Woolf

    The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.

    Jan 1, 1994

  • ISEE
    Utilizing the Pre-Blast Survey as a Vehicle to Promote Good Public Relations - A Case History

    By Wesley L. Bender, James E. Murray

    Pre-blast surveys are often conducted solely to document existing structural conditions and uncover potential problem areas. This paper presents a case history where the pre-blast survey was also used

    Jan 1, 1988

  • ISEE
    Determination of Flying Distance of Pieces in Demolishing Blasting

    By Zhang Qi

    For the most part, the flying piece is serious endangerment in the demolition blasting. To prevent the endangerment, a large number of materials are needed as the protection. Therefore, the determinat

    Jan 1, 1994