Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Airblast Control Techniques in Open Cut Mines

    By Alan: Moore Richards

    Effective control of airblast requires that significant factors be identified and satisfied by blast design and careful implementation. Significant factors include charge mass, distance, face height a

    Jan 1, 2006

  • ISEE
    Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems

    By Bruce Vandenberg, R. Frank Chiappetta, John Foley

    Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of

    Jan 1, 2000

  • ISEE
    Applied to a High Risk Case History

    By C Agreda

    The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di

    Jan 1, 2005

  • ISEE
    Techniques for Assessing the Performance of Explosives and Initiating Devices

    By A R. Cameron

    "The number of commercial explosive products available to the mining industry has been steadilyincreasing and associated with this there has been an increase in the range of characteristics or propert

    Jan 1, 1994

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • ISEE
    Public Relations Program on a Deep Tunnel Project in Atlanta

    By Gregory B. Poole

    As part of a $3.5 billion program to improve the antiquated waste water system in the city of Atlanta, the Nancy Creek Tunnel is being constructed across the northwest portion of the city. This tunnel

    Jan 1, 2005

  • ISEE
    Blasting in Antarctica

    By Charlie Brumbaugh

    Antarctica with its diverse conditions such as severe cold, high winds, rock and ice structure and limited explosives available posed many obstacles. This paper will give an overall view of the method

    Jan 1, 2000

  • ISEE
    The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines Limited

    By Sam Kangwa, Thomson Sinkala

    In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese

    Jan 1, 2004

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • ISEE
    Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions

    By Dale Preece, Steven Sobolik, Richard Jensen

    Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public

    Jan 1, 2000

  • ISEE
    Compromising Technology with Field Expedience in Fragmentation Evaluation

    By Jason M. Ryan

    "Along with recent advances in computer technology have come cost-effective systems desiiedto evaluate fragmentation distributions through digital images of particles. In mining operations andmineral

    Jan 1, 1998

  • ISEE
    Stratablasttm - A New Mining Method

    By T Goswami

    The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and

    Jan 1, 2006

  • ISEE
    Destructive Wave Interference in Underground Blasting Utilizing Precise Timing.

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Jerry Chambers, Scott Crabtree, Randy Wheeler

    Destructive wave interference has been studied in theory for many years. In application however, limited information can be found. Recently, circumstances have enabled a multidisciplinary team to util

    Jan 1, 2006