Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor AreaBy Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Dynamic and Static Load Testing: A Cost Savings ApproachBy Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez
A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations
Jan 1, 2019
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Some Norwegian Experiences Related to Use of Dry-Mixing Methods to Improve Stability of Excavations and Natural Slopes in Soft ClaysBy Ørjan Nerland, Torgeir Haugen, Astri Eggen, Kjell Karlsrud
"Ground improvement by the deep dry mixing (DDM) method is used in Norway since the late 1970's. A brief review is given of the Norwegian guideline for ground improvement with DDM issued in 2012, but
Jan 1, 2015
-
Helical Piers/ Anchors in the Chicago Building CodeBy Gary L. Seider, Dana A. Wesolek, Fred C. Schmednecht
"A new condominium project, The Atelier, developed by Pickus Companies located at the corner of Bryn Mawr and Sheridan in Chicago, IL required an earth retention system to protect the surrounding road
Jan 1, 2005
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Site Specific Study for Foundation Design of Iswar Gupta BridgeBy Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015
-
Verification Of Drilled Shaft Resistance By The Post Grouting MethodBy Suthan Pooranampillai
Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c
Jan 1, 2010
-
Current State of Practice of Corrosion Protection in Europe with Hollow Bars - Comparison to Methods Being used in North AmericaBy Alice Y. Tseng, Dan MacLean
"Corrosion protection of all deep foundation systems made of steel is THE issue when considering durability of the element in the long term. Protecting steel from corrosion and maintaining the steel t
Jan 1, 2017
-
Influence of Different Parameters on the Behavior of Laterally Loaded Piles in SandBy Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi
Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under
Jan 1, 2017
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger SuperstoreBy George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2005
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design SpecificationsBy Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.
In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re
Oct 1, 2022
-
Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In VietnamBy Leong, William. Chong, Kam Weng
Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application
Nov 1, 2022
-
“Special Application Of Micro-Piles” For The Construction Of A Bridge Well FoundationBy Nagarajkumar BV
Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu
Nov 1, 2022
-
Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017