Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Safe Execution Of Special Foundation Works Analysis - Concept - Implementation

    By Walter Ensinger

    Special foundation works is one of the most innovative sectors in civil engineering and construction. Both engineering techniques and construction machinery are undergoing continu­ous further developm

    Jan 1, 2002

  • DFI
    Study Of Hammer Selection For Driven Steel Pipe Pile

    By Jiwei Duan

    The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie

    Jan 1, 2006

  • DFI
    Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground

    By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu

    During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston

    Jan 1, 2018

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • DFI
    Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - Introduction

    By John P. Turner

    The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback

    Jan 1, 1990

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    The Effects Of System Components On The Deflection Of MSE Retaining Walls

    By Scott C. Vollmer

    This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str

    Jan 1, 2003

  • DFI
    Development and Experiences on Versatile Applications of RD-pile Wall

    By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen

    "Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist

    Jan 1, 2014

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils

    By Mohammed Sakr

    This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.

    Jan 1, 2012

  • DFI
    Biodegradable Hydraulic Fluid in the Deep Foundation Industry - Synopsis

    By S. H. Miller

    Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine

    Jan 1, 2000

  • DFI
    Urban Legends: Two Case Studies That Redefine "Impossible"

    By Grant R. J. Bearss

    Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",

    Jan 1, 2002

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft Construction

    By C. Vipulanandan

    It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • DFI
    Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method

    By Masaki Kitazume

    "Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua

    Jan 1, 2014

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005