Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
Toward A Unified Design Standard For Steel Sheet PilingBy Michael J. Garlich
Steel sheet piling has a long history of use in a variety of permanent and temporary structures. Current engineering practice uses numerous publications and standards for design guidance. U.S. desig
Jan 1, 2008
-
Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WYBy Brent Wilkins
The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed
Jan 1, 2009
-
Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)By Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2013
-
Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault ZoneBy Steven D. Scherer
The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern
Jan 1, 2001
-
Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
Comprehensive QA/QC Integrity Testing Using Thermal Integrity ProfilerBy Brad W. Taylor
"During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable
Jan 1, 2017
-
Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye
This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma
Jan 1, 2008
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001
-
Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit ProjectBy Jeongbok Seo
The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m
Jan 1, 2010
-
King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced SettlementBy Clif Kettle
The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified
Jan 1, 2008
-
Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate AnchorsBy Osama A. Safaqah
Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to
Jan 1, 2013
-
Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?By John L. White
The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi
Jan 1, 1990
-
Retaining Wall Installation Beneath An Existing StructureBy Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Long Term Performance of Grouts and the Effects of Grout By-ProductsBy Stephan A. Jefferis
I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the
Feb 10, 2003
-
Laboratory Mixing and Testing for Controlled Waste Disposal SiteBy Tomohiro Yamasaki
"At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand
Jan 1, 2015
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel ExtensionBy Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty ClayBy Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang
"A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we
Jan 1, 2005
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005