Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)

    By John D. Nelson

    Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot

    Aug 1, 2013

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • DFI
    Correlation between Undrained Shear Strength in Dry Deep Mixing Columns and Unimproved Soft Soil

    By Stefan Larsson, Jan Ekström, Jennie Kock-Larsen, Håkan Garin

    "This paper describes the testing procedure (or protocols) for quality control of dry deep mixing columns in a major ground improvement project carried out in Sweden. Quality control was mainly based

    Jan 1, 2015

  • DFI
    Analysis of Laterally Loaded Free-Head Pile Groups in Sand

    By Ashraf M. Eid

    Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall

    Jan 1, 2005

  • DFI
    Acceptance Of Timber Piles Based On Equivalent Driving Energy

    By Chu E. Ho

    This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final

  • DFI
    Unified Design Of Piles And Pile Groups Considering Capacity, Settlement, And Negative Skin Friction - 1. Introduction

    By Bengt H. Fellenius

    It is a truism that in the design of pile foundations one must consider both capacity and settlement. As to capacity, most basic text books contain simple methods of design of capacity of single pile.

    Jan 1, 1991

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Driven Piles In Central Texas Expansive Soils

    By Clayton A. Signor

    Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl

  • DFI
    Numerical Modelling Of Nonlinear Piles ? Synopsis

    By S. P. Lin

    The numerical models of nonlinear piles for deep foundations are studied in this paper. The purpose of these is to clarify the mechanical behaviour of deep foundation nonlinear piles subjected to axia

    Jan 1, 2010

  • DFI
    Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T

    Oct 1, 2022

  • DFI
    Injecting Sustainability into Deep Soil Mixing Projects

    By Paul R. Lear

    Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi

    Sep 8, 2021

  • DFI
    TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load

    By Don W. Dotson

    In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be

    Aug 1, 2013

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27&apos; (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    TRD Soil Mixing at Herbert Hoover Dike

    By George Burke

    "Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the

    Jan 1, 2009

  • DFI
    Geospatial Project Information Management System At Herbert Hoover Dike

    By Jamey Rosen

    A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of

  • DFI
    Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile Wall

    By Takefumi Takuma, Ali Fayad, Shigeru Kambe

    "This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W

    Jan 1, 2017

  • DFI
    Implant Foundations – Press-in Piling Method for Urban Construction

    By Tsunenobu Nozaki

    "Basically, the “Press-in Piling Method” was invented to eliminate construction nuisances, such as noise and vibration which have been serious unsolved problems for advancing societies over a long tim

    Jan 1, 2015

  • DFI
    Soil-Structure Interaction For A Tension Pile Pulled With Strand

    By Chandramohan P. V

    A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve

    Nov 1, 2022

  • DFI
    Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev

    Jan 1, 2015

  • DFI
    Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test Verification

    By Tracy Brettmann, Melis Sutman, C. Guney Olgen

    "The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape

    Jan 1, 2017