Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    An International Programme in Research in Lead and Zinc

    By Schrade F. Radtke

    THE law of our present industrial society is the law of the jungle. By this I mean survival of the fittest. I do not refer to man or animal or the development of superior genetic strain. Rather do I r

    Jan 1, 1960

  • CIM
    The Elbof Method of Electrical Prospecting

    By E. E. Mueser

    As Mr. Lundberg has already ably covered the theory of various methods of electrical prospecting, I shall confine my remarks to a consideration of the features which must obtain in an electrical prosp

    Jan 1, 1926

  • CIM
    Smelting Furnace Melt Zone Wall Modification to Cope Higher Production Rate Operation

    By Antonius Prayoga

    PT Smelting adopted the Mitsubishi Continuous Technology for its copper smelter plant which has been operating since 1998. Through a series of expansion projects, the plant annual production capacity

    Jan 1, 2015

  • CIM
    Instrumentation and Control for Industrial Minerals - Current and Future

    By J. Scrimgeour

    "The word ""instrumentation"" has expanded from its original meaning, which in engineering perhaps referred to measuring apparatus alone. In its broadest form, it now includes sensors, display instrum

    Jan 1, 1967

  • CIM
    High-Intensity Waterless Cooling for Refractory Lined Vessels

    By B. Wasmund, M. Parravani, M. Jastrzebski, Z. Coull

    "One of the main drivers of overall profitability of pyrometallurgical vessels is refractory lining campaign life. Increased economic pressure to improve vessel life requires innovative solutions to t

    Jan 1, 2015

  • CIM
    The Knob Lake Iron Ore Deposits

    By R. D. Westervelt

    IN JULY 1954, the first iron ore from the deposits in the Knob Lake vicinity was mined and shipped to Seven Islands. The beginning of the production may well be the greatest advance in Canadian econom

    Jan 1, 1957

  • CIM
    Refractory Wear in Nickel and Cobalt Processing Furnaces

    By B. Drew, K. Budna, C. Wenzl, D. Gregurek, A. Spanring

    "The metallurgy of nickel and cobalt and of copper is closely interlinked when processing sulfidic Ni-Co ores and Cu-Co ores. The respective furnaces are typically lined with magnesia-chromite refract

    Jan 1, 2017

  • CIM
    Mathematical Modelling of Emissions during Pre Heating of Magnesia-Carbon Bricks

    By Saikat Chatterjee, Xintong (Brett) Liu, Kinnor Chattopadhyay

    Magnesia carbon bricks are commonly used in BOFs and are generally pre-heated before the BOF goes into service. Owing to very stringent emission regulations, the BOF pre-heating process need to be con

    Jan 1, 2015

  • CIM
    Inventory Predictive Control for Batch Process Production Regulation

    By C. Prévost, V. Leclerc, R. Pinto, M. Ruel

    "A buffer’s ability to dampen production variations is directly related to its size. Small buffers cannot handle large variations in production, resulting in production losses when their inventory is

    Jan 1, 2017

  • CIM
    Experimental and Modelling Research of Slag Properties in Nickel Laterite Smelting

    By Peter Hayes, Evgueni Jak, Taufiq Hidayat, Gary O’Connell, Denis Shishin, Jeff Chen, Francis Letarte

    "Knowledge of slag properties is required for the optimisation of smelting operations. The phase equilibria and viscosities of the Al2O3-CaO-FeO-Fe2O3-MgO-MnO-NiO-Cr2O3-SiO2 slags at conditions of int

    Jan 1, 2017

  • CIM
    An Overview of Valuation Practices and the Development of a Canadian Code for the Valuation of Mineral Properties

    By Keith Spence

    "The notion of ""value"" has always been a subjective and contentious issue. Indeed, Value is in the eye of the beholder. There are varied methods and practices for valuing property, as there are indu

    Jan 1, 2003

  • CIM
    Quality Assurance in Capital Projects, Opportunities and Challenges

    By Wilson Pascheto

    One of the main outcomes of a capital project is the reliability of a new plant, system or equipment. During 20 years of experience working in various capital projects for the mining industry, the aut

    Jan 1, 2015

  • CIM
    Break-Up in Formation of Small Bubbles: An Energy Consideration

    By P. Chu, J. A. Finch

    The formation of small bubbles in flotation is usually accomplished by the use of frothers, or sometimes is due to the presence of inorganic salts in the process water. The effective mechanism associa

    Jan 1, 2015

  • CIM
    Industrial natural gas technologies for the mining and metallurgy industry

    By A. Zaidi

    "The mining and metallurgy industry is highly energy intensive and one of the largest energy users in Canada. Energy costs are also a major component of total production costs in this industry as desc

    Jan 1, 1993

  • CIM
    The Underground Power Plant at Granduc

    By J E. McMynn

    The development of the Granduc mine presents a number of problems which are peculiar to its location and surrounding terrain. Because the development tunnels portal onto an area which is covered by an

    Jan 1, 1963

  • CIM
    Leaching Behaviour of a Colombian Nickel Laterite in Aqueous Alkaline Glycine Solutions

    By G. T. Lapidus, A. Garcés, O. J. Restrepo

    "Colombian nickel laterites have historically been processed by pyrometallurgy. However, due to the depletion in ore grades, alternative processes are required. Hydrometallurgical processes, such as p

    Jan 1, 2017

  • CIM
    Analysis of Microstructural Evolution Kinetics of Aluminum Alloy B206 during Artificial Aging using Non-isothermal Calorimetry

    By D. M. Maijer, S. M. Mohseni, A. B. Phillion

    The microstructure evolution kinetics of aluminum alloy B206 during artificial aging has been investigated using non-isothermal calorimetry. A combination of differential-scanning calorimetry (DSC) an

    Jan 1, 2015

  • CIM
    Stirred-Tank Bioleaching of a Pyrrhotite-Rich Tailings Sample

    By Y. Thibault, L. Morin, R. Cameron, D. Gould

    "There are an estimated 50 to 100 million dry metric tonnes of low-grade nickeliferous pyrrhotite tailings in the Sudbury area alone, with an average nickel grade ~0.8% (plus cobalt). Pyrrhotite is a

    Jan 1, 2017

  • CIM
    Recovery of Hematite from HPAL Residue of Laterite Ore

    By G. Azimi, C. A. Ang, F. Zhang

    "Nickel recovery from laterite ores generates large amounts of solid and liquid wastes. This is primarily due to the low concentration of Ni (about 1.4 wt%) in the feed ore to the High-Pressure-Acid-L

    Jan 1, 2017

  • CIM
    An Innovative Process for the Separation of Iron in Mixed-Chloride Medium: A Case Study for Lateritic Ore

    By M. A. Halim, V. I. Lakshmanan, Z. Jankovic

    An innovative mixed-chloride process for the separation of iron from lateritic ore is described. The separation of Fe(III) from leach liquor is an important process step for the recovery of nickel and

    Jan 1, 2015