Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Chemical Modelling Of The Fe2(SO4)3–FeSO4–H2SO4–H2O System

    By J. D. T. Steyl, C. A. Biley

    "The chemistry of electrolyte systems containing iron remains generally poorly understood despite their prevalence in many natural and industrial processes, particularly in hydrometallurgy. These syst

    Jan 1, 2016

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • CIM
    Stratigraphy and structural analysis of the North Gold Zone at Montauban-les-mines, Quebec

    By Jean-Marc Simard, Vincent Jourdain, Denis W. Roy

    "Seven lithologic units, informally characterized, were recognized in the vicinity of the Montauban orebody. The first five lie in stratigraphic order. From structural bottom to structural top these a

    Jan 1, 1987

  • CIM
    Installation of Flash Flotation Units at the Louvicourt Concentrator

    By Bernard Dallaire, Jean Cayouette, Sylvain Duchesne

    "Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues

    Jan 1, 2001

  • CIM
    Owl Creek Processing Summary

    By O. Matwijenko

    "1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with

    Jan 1, 1988

  • CIM
    Coarse Lead Flotation Practice at Polaris

    By R. Simkus, J. K. Gowans

    Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation

    Jan 1, 1984

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Mineralogy and characteristics that affect recoveries of metals and trace elements from the ore at Heath Steele Mines, New Brunswick

    By T. T. Chen, W. Petruk

    The mineralogy of the feed, concentrates and tailings from the Heath Steele mill in New Brunswick was studied in detail to determine the liberation and recoveries of the major ore minerals, and to cha

    Jan 1, 1980

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Investigating Total Media Wear

    By Peter Radziszewski

    "Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing

    Jan 1, 2001

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • CIM
    How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs

    By A. Tylczak, C. Norman, C. Shook, S. Loif

    "There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m

    Jan 1, 2015

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Tonnage Oxygen Use in Gold Leaching

    "Air Products approached LAC Minerals in 1987 to initiate trials with pure oxygen in the leach circuit at several LAC facilities in Canada. This paper gives an overview of oxygen use and covers specif

    Jan 1, 1990

  • CIM
    Tyrethane for Screening Fabrication

    By S. L. Aaroe

    "TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove

    Jan 1, 1976

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Agglomeration of Sulphide Minerals

    By J. A. Finch, J. Vergouw

    "Flotation selectivity becomes progressively more difficult to achieve with decreasing particle size. One of the possible problems is agglomeration, i.e. particles clustering together. One mechanism d

    Jan 1, 1997

  • CIM
    Diamond Project Development ? An Holistic Approach

    By Jarek Jakubec

    The new euphoria in diamond exploration brings with it a need to understand the challenges that new projects can face in different stages of the development and risks that the commercial outcomes from

    May 1, 2006