Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Production of Ultrafine Ferrite Using Designed Experiments

    By D. K. Matlock, D. J. Hamre, J. G. Speer

    Ultrafine ferrite (UFF) grains may be produced in surface layers of plate steels using controlled intermediate cooling followed by deformation. Experiments were conducted using a 0.12 C - 1.26 Mn stee

    Jan 1, 2004

  • CIM
    Heavy mineral by-products from Athabasca tar sands

    By Lloyd W. Trevoy

    Syncrude Canada Limited is presently studying commercial production of heavy minerals from plant tailings of the openpit A lhabasca tar sands operation. When tar sands are processed and upgraded to sy

    Jan 1, 1984

  • CIM
    Sinking No. 5 Winze at Wright-Hargreaves Mine

    By W. T. Sampson

    Introduction The Kirkland Lake (Ontario) property of Wright-Hargreaves Mines, Limited, - consists of four claims. The two main shear zones or 'breaks' of the Kirkland Lake camp extend thr

    Jan 1, 1948

  • CIM
    Potash -Promise and Problems

    By Nelson C. White

    This paper summarizes the present state and future prospects of the potash industry, with special reference to its impact on production in Saskatchewan.

    Jan 1, 1968

  • CIM
    Measurement by the New Borehole Inclinometer Using FBG Optical Fiber Sensors for Slow Moving Rock Slope

    By H. Kuno, H. Kobayakawa

    A borehole inclinometer with FBG optical fiber sensors has been developed to clarify very slow slope movements, and the results of its application to a real slope have been shown. The main characteris

    Jan 1, 2015

  • CIM
    Human-Robot Integration for Pose Estimation and Semi-Autonomous Navigation on Unstructured Construction Sites

    By Chen Feng

    Compared to widespread successful deployment of robotic manipulators for repetitive and hazardous tasks in related industries such as manufacturing, the construction industry has achieved relatively l

    Aug 1, 2013

  • CIM
    Geology of the Voisey’s Bay Ni-Cu-Co Deposit, Labrador, Canada

    By Rosie Moore, Harvey Keats, Kerry Sparkes, A. J. Naldrett

    "Abstract-The Voisey’s Bay Ni-Cu-Co deposit was discovered in late 1994 as the result of prospecting initiated in the summer of 1993. By July 1995, proven mineable reserves were 31.7 x 106 tonnes grad

    Jan 1, 1996

  • CIM
    Factors Controlling Fracture Extension

    By C. R. Fast, G. C. Howard

    The loss of fluid to the formation adjacent a fracture governs the areal extent of the fracture and the success of hydraulic fracturing as a production stimulation technique. The three flow mechanisms

    Jan 1, 1961

  • CIM
    Ventilation on Demand ? The Impact of Sensors, Installation, Control Strategies, Commissioning and Advanced Controls Performance

    By J. Janzen

    The cost to supply ventilation may exceed 40% of the total mine energy cost for underground mines and is often higher for deeper mines. The goal of Ventilation-on-Demand (VOD) is to ensure that the re

    Aug 1, 2013

  • CIM
    Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper Industry

    By A. Bezama

    For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a

    Jan 1, 2007

  • CIM
    Ventilation-on-Demand: Key Considerations for the Business Case

    By Trang T. Tran-Valade

    With continually increasing energy prices, the mining industry has been on the search for new energy optimization technologies. One area that is garnering great interest is Ventilation-On-Demand (VOD)

    May 1, 2013

  • CIM
    Falconbridge Mine-No. 9 Internal Shaft and Facilities

    By V I. McCallum

    In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ

    Jan 1, 1964

  • CIM
    Enhancing Blast Efficiency and Fragmentation Through PSD Analysis and first comminution stage Optimization

    By N. F. Faria, F. Monteiro, B. O. Taiwo, A. Palangio, D. Fonseca, J. Manuel

    This paper explores the interpretation and application of Particle Size Distribution (PSD) curves in optimizing blast design and enhancing downstream operations. The study looks at important factors l

    May 4, 2025

  • CIM
    Water treatment

    By P. M. Shibley

    "IntroductionMine drainage, surface. drainage and process liquors are the principal mine and mill effluents. The quantity and quality of these flows varies according to mineralogy, type and scale of m

    Jan 1, 1989

  • CIM
    The Gold-pyrite Association in Witwatersrand Reefs: Evidence for Electrochemical Precipitation of Gold

    By P. Müller, W. J. Przybylowicz, V. M. Prozesky, D. de Bruin

    "Abstract -The common style of gold mineralization in the Basal Reef and other auriferous conglomerates of the Witwatersrand Supergroup comprises clusters of gold grains occurring interstitially to qu

    Jan 1, 1994

  • CIM
    The Preservative Treatment of Mine Timbers

    By J. F. Harkom

    Introduction The importance of the preservative treatment of mine timbers need scarcely be stressed here. Increasing the life of mine timbers will reduce one of the major costs of mining and also c

    Jan 1, 1930

  • CIM
    Trends in Canadian Diamond Exploration

    By L. H. Thorleifson

    Demand for both gem and industrial diamonds is very strong. Synthetic production supplies industrial uses, but synthetic gems remain inferior and expensive, so the large gem market is supplied by mini

    May 1, 2003

  • CIM
    The Collection and Management of Environmental Data at Mine Sites

    By Paul J. Beck

    The impact of mining development on the environment can be minimized through comp careful construction and accurate monitoring. Key to meeting these objectives is t information at all stages of design

    May 1, 2004

  • CIM
    Large Flotation Cell Operation at Falconbridge Copper Limited – Opemiska Division

    By J. R. Maxwell

    In 1970 expansion was completed increasing mill capacity from 2,000 to 3,000 T.P.D. Actual grinding capacity is 3,400 T,P,D. at a grind of 60% -200 mesh,The ore bodies are vein type, containing about

    Jan 1, 1974