Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    BioHeap® – Breaking the Grade/Recovery Curve for Nickel Concentrators

    By J Fewings, T McCredden, S Seet, C Fitzmaurice

    "Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio

    Oct 10, 2016

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis

    By C Fricke, R Wood, P Velletri

    "In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ

    Nov 24, 2014

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine

    By D Willis, A Shanahan, C Jacobs, T Luxner

    The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin

    Sep 17, 2014

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017