Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Where are the Women? Highly Qualified Women in the Mining Industry

    By M Scoble, C Hughes, M Roberts

    At 14 per cent, the representation of women working in the mining industry is the lowest among primary industry categories in Canada. Despite an increase in research and industry commitment to advance

    Nov 20, 2012

  • AUSIMM
    Unsupervised Methods for Assessing Domain Homogeneity

    By D Lawie

    Prior to resource modelling, sample scale data is normally grouped into spatial domains that reflect zones of homogenous properties. These domains are usually based on a combination of grade and other

    Sep 5, 2011

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    Use of Anchored Gaskets in Segmented Bored Tunnels

    By A Roseman, T Gruber

    Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation

    Sep 17, 2014

  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    New Ore Types from the Cauê Banded Iron Formation, Quadrilátero Ferrífero, Minas Gerais, Brazil – Responses to the Growing Demand

    By L Q. Amorim

    The mining district of the Quadrilátero Ferrífero (QF) in southeastern Brazil contributes to 70 per cent of the Brazilian iron ore production, which reached 370 Mt in 2010. Traditionally, four iron or

    Jul 11, 2011

  • AUSIMM
    Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

    By A Ross, B De Rivaz

    The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by u

    Sep 17, 2014

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    New Zealand's Mining and Mineral Exploration in Perspective

    Miners and mineral explorers are concerned at the increasingly hostile environment being generated towards their industry and their profession. There is little official or public recognition that the

    Jan 1, 1977

  • AUSIMM
    Wireless System for Monitoring Cave-back Propagation

    By S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi

    The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I

    May 9, 2016

  • AUSIMM
    Effect of Dynamic Pressure on Electronic Detonator Timing

    By R Ibarra, H Solis, G Teowee, B E. Papillon

    The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d

    Aug 24, 2015

  • AUSIMM
    Dust and diesel characterisation in underground coalmines

    By N LaBranche

    The resurgence of Silicosis and Coal Worker’s Pneumoconiosis (CWP) in coalmines has placed the spotlight back on the management of worker exposure to particulate matter across all mining sectors (Coal

    Oct 12, 2022

  • AUSIMM
    Recent Advances in Zinclor Technology

    By Frfas C, Parrilla F, Regife J. M

    A project to develop the Zinclor electrowinning cell to industrial size is being conducted at Tecnicas Reunidas' Research and Development Centre with Spanish Ministry of Industry support. This

    Jan 1, 1993

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Carrapateena Crusher Station One – Optimisation and excavation

    By A Mooney, G Balog, P Burns, R Brooks

    This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as

    Mar 15, 2021

  • AUSIMM
    Recent Process Developments at the Phu Kham Copper-Gold Concentrator, Laos

    By P Walker, I Crnkovic, D Bennett

    The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex

    Oct 29, 2012

  • AUSIMM
    Cooling Pathways for Deep Australian Longwall Coal Mines of the Future

    By B Belle, M Biffi

    Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu

    Jul 1, 2013

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011