Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    TEMCO û The Australian Ferro Alloy Producer

    By Berglin IK

    Since 1962, ferro alloy production in Australia has been concentrated at Bell Bay, Tasmania with a major expansion occurring in 1976. This concentration was based originally on the perceived requireme

    Jan 1, 1985

  • AUSIMM
    Debt Finance: The Technical Factors (50de71c4-58a1-41b8-8a8f-c9c6dc3998dd)

    The key to the successful debt funding of a new mining project, whether in economically established or developing nations, is the submission of a comprehensive feasibility study. The feasibility stud

    Jan 1, 1995

  • AUSIMM
    Seminar Keynote Address

    To reflect on the early history of mining in South Australia requires considerable imagination and rashness. The people who were the chief actors in the scene have long since passed away. Accounts

    Jan 1, 1987

  • AUSIMM
    The Use of Isanol at Roseberry Mine

    The problems encountered with the introduction and use of Isanol underground are described. Significant direct as well as indirect savings have resulted from the use of Isanol. Field studies have s

    Jan 1, 1977

  • AUSIMM
    Grade Control Techniques at Paddington Gold Mine

    By Amos QG

    The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan

    Jan 1, 1986

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Reliable Mine Planning in a Thick Undulating Coal Seam Based on Long-hole Directional Drilling

    By Fowke NC, Williams RJ, Hungerford F

    In-seam, directional drilling has been implemented at Huntly West Mine, New Zealand as the most cost effective means of obtaining geological information at a level of detail and accuracy required for

    Jan 1, 1991

  • AUSIMM
    Bauxite Mining with a Mobile Crusher and Overland Conveyors at Pinjarra, Western Australia

    Alcoa of Australia's Del Park mining op eration is centred 9 km. east of the Pinjarra alumina refinery, and is centrally locatedwith- in the 10, 000 sq. km. lease which the Company holds for ba

    Jan 1, 1973

  • AUSIMM
    Social Responsibility and Obligations to Indigenous Populations

    By Taylor MN

    The influx of an industrial environment into or adjacent to the indigenous society has in the past frequently caused the breakdown of traditional be- haviour and culture, and the generation of socia

    Jan 1, 1978

  • AUSIMM
    Living With Change - A University View of Minerals Industry Research in The 1990s

    There has been a substantial transition in the minerals industry R&D environment in the last five to ten years. Changes have occurred in the client and contractor base, the sources and scale of fu

    Jan 1, 1996

  • AUSIMM
    Computer Simulation of In-Situ Leaching Relevant to the Broken Hill District

    A simulation of the fluid flow, minera- logical and chemical aspects of in situ leaching is being developed for application to the recovery of metals from unbroken, naturally jointed rock. The flui

    Jan 1, 1984

  • AUSIMM
    Temporary Support Load Development Along a Longwall Face Drivage

    By Isaac AK

    The combination of shot-firing and stage loader, and a prop and bar support system is an accepted drivage method. The support configuration is based on the final prop density, and assumes relitive

    Jan 1, 1986

  • AUSIMM
    The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria

    By Mack JF

    A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro

    Jan 1, 1984

  • AUSIMM
    Blast Design Considerations for In-Situ Retorting of Oil Shale

    By Paine GG

    The in-situ retorting of shallow oil shale deposits is an attractive alternative to the material handling problems of conventional open pit mining techniques, which involve removing overburden, fragme

    Jan 1, 1985

  • AUSIMM
    The Jacobs Sliding Floor: Current Competitive Applications

    The Jacobs Sliding Floor (Floor) is experiencing a surprisingly long competitive life. The first Floor was used on the Camino Tunnel in California in 1960. At that time the Robbins Company had bui

    Jan 1, 1987

  • AUSIMM
    Results of Exploration in Authority to Prospect 57P Surat Basin, Queensland

    Authority to Prospect 57P lies within the Surat Basin',' an eastern lobe of the Great Artesian.Basin, a major Mesozoic . downwarp that,had its inception'in Triassic time. The northern e

    Jan 1, 1962

  • AUSIMM
    Northern New Caledonia High-Pressure Metamorphic Core Complex. From Continental Subduction to Extensional Exhumation (c658081c-16ac-4064-adcc-70af08792195)

    By Aitchison J, Clarke G

    A reappraisal of the stratigraphy, new regional kinematic analysis and thermobarometric data allow a new interpretation of the metamorphic zoning and tectonic structure of the Upper Eocene high-press

    Jan 1, 1995

  • AUSIMM
    Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines Limited

    The Racecourse Orebodies at Mount Isa consist of a series of parallel steeply dipping lead/zinc/silver orebodies with a strike length of up to 1000 metres. Production from these orebodies between 1

    Jan 1, 1977

  • AUSIMM
    An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South Wales

    By Poole GR

    An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s

    Jan 1, 1986