Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Disposal of Concentrating Mill Residues at Broken Hill, N.S.W. with Particular Reference to the Broken Hill South LTD.

    AT Broken Hill, N.S.W., where flotation is tbe final stage in concentration, the gangue minerals are discharged as an aqueous pulp, and water recovery from the pulp being essential, provision must be

    Jan 1, 1927

  • AUSIMM
    Low Shock Energy Emulsion Based Wet Hole Explosives

    By Moxon N. T

    A series of low shock energy water resistant emlulsion based explosives have been developed by combining inert materials, such as Perlite P500, into the formulation. The material handling, water res

    Jan 1, 1990

  • AUSIMM
    Continuously Cast Zinc Alloy Bar Stock - Applications and Benefits

    The continuous casting of zinc alloys has been of fundamental importance for many years in the production of a number of products, including sheet for architectural applications, battery cans for dr

    Jan 1, 1993

  • AUSIMM
    Geology and Gold Mineralisation at Mount Leyshon, North Queesland

    By Hodkinson I, Teale GS

    Mount Leyshon is an open cut-heap leaching operation that commenced production in early 1987. Open pit reserves are 6.3 m.t. grading 1.8 g/t Au and 4.8 g/t Ag and expected annual production is 68,

    Jan 1, 1987

  • AUSIMM
    Paper No. 163. The Mining And Metallurgy of Copper, Silver, Lead, and Zinc

    In order that the processes seen may be followed in their proper 'order, the subject will be dealt with as follows, (1) Wallaroo and Moonta Mines; (2) Wallaroo and Moonta Mines Smelting Works; (3

    Jan 1, 1907

  • AUSIMM
    Mining and Handling of Nauru Phosphate Rock

    Nauru Phosphate, which is one of the world's highest grade deposits discovered to date, contributed in 1969, 2.2 million tons of the total world production of 77.7 million tons. Phosphate produ

    Jan 1, 1971

  • AUSIMM
    The Foreland Thrust Belt of Papua New Guinea

    By Finlayson E, Hilyard D, Francis G

    Papua New Guinea's mainland is dominated by a foreland thrust belt, which can be divided into two zones. The "body" zone is floored by Palaeozoic granites and metamorphics of the Fly Platform

    Jan 1, 1987

  • AUSIMM
    The Role of Cyanide in the Elution of Gold from Activated Carbon

    By Lorenzen L, Van Der P F

    It is the aim of this paper to review recent research in understanding the role of cyanide in the elution of gold. Under conditions of severe pre-treatment (high temperatures and levels of cyanide), t

    Jan 1, 1992

  • AUSIMM
    The Breccia Environment : 50-Year Retrospection

    Recognition is the most important aspect in the use of breccias as an exploration tool. Ore-hosting breccias occur in a wide variety of environ-ments, shapes, compositions and characteristics, but gen

    Jan 1, 1990

  • AUSIMM
    Chronostatistics ù A Powerful, Pragmatic New Science for Metallurgists

    Forty years ago Dr Pierre M Gy, a metallurgist, introduced variography as applied to monitoring a process. Consequently, his followers used the variogram to elaborate meaningful process control charts

    Jan 1, 2006

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

    By J Schrank

    Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking

    Sep 17, 2014

  • AUSIMM
    Nanisivik Mine - Operations and Innovations in a Arctic Environment

    By Sutherland R. A, Rawling K. R

    The Nanisivik Mine is located 750 km north of the Arctic Circle at the north end of Baffin Island in the Canadian High Arctic, and has been in production since 1976. The paper describes the regional

    Jan 1, 1993

  • AUSIMM
    Application of Whittle Four-D to Risk Management in Pit Optimisation

    Nine case studies are presented to illustrate how risks can be, minimised or quantified during pit optimisation, utilising Whittle Four-D software. Each case study covers a specific problem that has

    Jan 1, 1994

  • AUSIMM
    On-line Determination of Moisture in Coal and Coke

    By Sowerby BD

    The CSIRU Division of Mineral Engineering is developing various techniques for the on-line determination of moisture in coal and coke, and some instruments are now commercially available. These te

    Jan 1, 1987

  • AUSIMM
    The Aluminum û Iron Phosphatic Overburden of Christmas Island, Indian Ocean: Its Mineralogy, Mineral Chemistry and Thermal Transformations

    The phosphatic overburden of Christmas Island is a lateritic soil and consists dominantly of crandallite and millisite. These minerals are polymorphs of general formula, (Na,K)x Ca2-x (Al, Fe)6 (PO4

    Jan 1, 1971

  • AUSIMM
    The Application of Rock Mechanics to Mining at Renison Limited

    During the past 18 months a rock mechanics project has been in operation at Renison Limited. The project was established to identify and investigate key problem areas that would affect future prod

    Jan 1, 1982

  • AUSIMM
    Leslie Bradford Golden Jubilee Oration

    LESLIE BRADFORD GOLDEN JUBILEE ORATION "Not only a metallurgist but a scientist of the highest order" Leslie Bradford and the Australian Metallurgical Industry

    Jan 1, 1987

  • AUSIMM
    The Path to Successful Roof Support Automation

    The first hydraulic roof supports were installed underground in 1950s and ever since that time engineering developments have improved the supports in many different ways. However. advances in three ma

    Jan 1, 1991

  • AUSIMM
    Pre-Splitting - Wall Control for Surface Coal Mines

    By Cocker A

    Pre-splitting for smooth highwall formation is conducted in around 75 per cent of surface coal operations within Australia. The CMTE (Centre for Mining Technology and Equipment) in conjunction with

    Jan 1, 1995