Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    RI 8261 Factors Affecting Fabricability of Electrowon Copper

    By J. L. Holman

    The Federal Bureau of Mines has conducted research to delineate factors affecting relative fabricability of electrowon and electrorefined copper. The Bureau's Rolla Metallurgy Research Center coo

    Jan 1, 1978

  • NIOSH
    OFR-117-79 Evaluation Of Coal Mine Electrical System Safety

    By Lloyd A. Morley

    This annual report details progress under USBM Grant G0155003 during the project period of January 1, 1977 through December 31, 1977. The report contains four principal chapters covering accomplishmen

    Jan 1, 1978

  • NIOSH
    OFR-59-79 Improving The Self-Sealing Brattice

    By Richard D. Mehring

    A refined ad improved self-sealing brattice for use in coal mine rescue and recovery operations for directing the flow of air has been developed and tested by Goodyear Aerospace Corporation for the U.

    Jan 1, 1978

  • CIM
    Energy Efficiency ? High or Low Priority for Management in the Industrial Minerals Industry?

    By Barry James

    Energy, like labour and materials, is one of the basic production inputs in the industrial minerals industry. This paper discusses the significance of the changing energy situation in Canada as it aff

    Jan 1, 1978

  • AIME
    Microcrystaline Silica--The Energy Saver

    By John P. Norton

    Microcrystalline silica has been mined in Illinois from the Clear Creek Formation since the turn of the century, especially in the area around Tamms in Alexander County, in the southernmost part of th

    Jan 1, 1978

  • CIM
    The Geology of the Cluff Lake Uranium Deposits

    By Charles T. Harper

    The uranium deposits discovered by Amok (Canada) Ltd. in the Cluff Lake area of north western Saskatchewan occur at or near the southern edge of the uplifted basement core of the Carswell circular str

    Jan 1, 1978

  • NIOSH
    OFR-106-79 Quick-Fix Blowout Stopping Field Evaluation

    By Mackenzie Burnett

    Quick-Fix Blowout Stoppings were evaluated in several underground mines as an alternative to conventional ventilation control bulkheads. Blowout stoppings offer considerable savings in bulkhead constr

    Jan 1, 1978

  • CIM
    Occupational Health and Safety in Metallurgical Plants

    By John C. Taylor

    A resource document, prepared for the Royal Commission on the Health and Safety of Workers in Mines, which outlines aspects of occupational health and safety in the Canadian metallurgical industry has

    Jan 1, 1978

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • SME
    Improvements Of The Determination Of Block Grades From Blast Hole Data In Porphyry Type Deposits

    By Miche1 Dagbert

    In most open pit operations mining porphyry type deposits, production planning rests on an are reserve inventory block file which is derived from diamond drill hole data. With such a practice, the way

    Jan 1, 1978

  • NIOSH
    OFR-2(3)-81 Training And Inspection Manual For The Assembly Of Wire Rope Terminations

    By John T. Metcalf

    The assembly procedures for nine different wire rope terminations used in the mining industry are presented in a format and manner to facilitate training and to provide points where inspection of the

    Jan 1, 1978

  • SME
    Stockpile Simulation For Coal Port

    By Andrew T. Zador

    The growing demand for energy combined with the need to protect and preserve the environment have become prime considerations in the design of efficient coal handling ports and their associated stockp

    Jan 1, 1978

  • NIOSH
    OFR-99-79 Development Of An Improved Machine Mounted Methane Detector System

    By Wilbur L. Webb

    This publication reports on the design, fabrication and test of an Improved methane monitor system for compliance to 30CFR75.313. The system will Initiate automatic shutdown of mining machinery when e

    Jan 1, 1978

  • CIM
    Coal Gasification For Industrial Use and Power

    By R. D. Merer

    The production of low- and medium-Btu gas from coal provides a more economic source of energy for most industrial users than pipeline-quality coal gas (SNG), although the latter has received more publ

    Jan 1, 1978

  • NIOSH
    OFR-20-81 Combined Fire/Rot Retardant Treatment For Wood Mine Timber

    By Bernard Baum

    Combined preservative/fire retardant systems were pressure impregnated into Douglas fir and Ponderosa pine samples and evaluated for decay, flammability, and mechanical properties. The objective of

    Jan 1, 1978

  • SME
    The Maximum Economy Smidth/Parsons Preheater

    By Henning R. Norbom

    Lime has been produced for many centuries. The simple pot kiln was one of the first devices used in this process. It was constructed of stone often on the side of a hill to reduce construction efforts

    Jan 1, 1978

  • NIOSH
    OFR-84-79 Factors Influencing The Solution Rate Of Uranium Dioxide Under Conditions Applicable To In Situ Leaching

    By A. Renton Amell

    The rate of dissolution of U02 was measured in acid solutions similar to those used for in situ leaching, with S04 of 10-1.82 to 10-4 M, Fe(III) of 10-2 to 10-4 M and pH's of 1.1 to 2.3. The depe

    Jan 1, 1978

  • NIOSH
    OFR-56-78 Implementation Of A High Speed, Heavy Current, DC Switching System

    By Howard B. Hamilton

    Laboratory performance of mercury filled current limiting devices (CLD) used for high speed switching of DC circuits (600 volts and below, up to 1000 amperes) using a system involving a parallel conne

    Jan 1, 1978

  • NIOSH
    OFR-67-80 Identify And Evaluate Lightweight Support Substitutes

    By Gilbert L. Forst

    The objective of this program is to identify and evaluate superior, lightweight substitutes for selected coal mine roof support concepts such as crossbars, posts, and crib blocks. Engineering analysis

    Jan 1, 1978

  • CIM
    Mining (e7ac18b4-67b5-4874-86f7-745272387544)

    By Gillyeard J. Leathley

    The Cassiar Asbestos mine is situated on McDame Mountain in northern B.C. at a mean elevation of 6000 ft (1830 m), some 6 miles (9.6 km) from the townsite /mill complex. Asbestos ore production averag

    Jan 1, 1978