Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    How Leadership Can Create an Enduring Safety Culture

    By J Ross

    The foundation of effective leadership is communication. You can have all the leadership theories, models and training you want, but in the end it is all about leaders talking to, listening to and und

    Mar 21, 2011

  • AUSIMM
    Improved Technology – Selection of a Suitable Underground Concrete Transport Vehicle

    By S Mitchell

    Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th

    Mar 21, 2011

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    What Have we Learnt About Managing Rock Burst Risks?

    By Y Potvin

    Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i

    Mar 21, 2011

  • AUSIMM
    Sustainable Minerals Education – We Care, But do You?

    By D Laurence

    Mining cycles have come and gone and with them there have been dramatic swings in the levels of interest and student entry into minerals-related education programs, hence graduate supply to the indust

    Mar 21, 2011

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Waterproof Detailing in Drained and Undrained Tunnels

    By J Palise

    As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a

    Mar 8, 2011