Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Construction Costs

    By Cerutty L

    To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat

    Jan 1, 1922

  • SME
    Construction Of A TBM Launch Box In A Complex Urban Environment

    By Vincent Tirolo

    The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F

    Jan 1, 2013

  • SME
    Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, Oregon

    By Yves St-Amour, Vince Luongo

    This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately

    Jan 1, 2005

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948

  • SME
    Construction of the Longest Road Tunnel in Mexico

    By Miguel Angel Banuet Rodriquez, Hector Conceso Aragon

    "Construction of the longest road tunnel in Mexico is part of Acapulco’s alternate roadway to the scenic roadway project. This article provides a brief summary regarding details of the construction si

    Jan 3, 2018

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Construction Phase Services for Australian and North American SEM Tunneling - NAT2024

    By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim

    Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s

    Jun 23, 2024

  • ISEE
    Construction Up Raises with TH perforation

    By Iván Aguirre Palacios, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, mining operations seek to be competitive in the market. To achieve this, one of the relevant factors is to maintain and improve the productivity of the extractive processes, mainly the load

    Jan 26, 2026

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    Continuing Education A Critical Question

    By J. H. Brown

    "THE need for continuing education has been recognized only in fairly recent years as a major concern of the engineering profession. Formerly, it was acknowledged that engineers were required, at leas

    Jan 1, 1966

  • SME
    Continuous Dust Measurement Underground with OSIRIS

    By L. E. Baker, M. J. Leck

    OSIRIS is a continuous monitoring system for respirable dust which has been specifically designed for mining and related industries. By using the latest microprocessor technology, OSIRIS provides a so

    Jan 1, 1987

  • TMS
    Continuous Fuming of Zinc-Containing Slags

    By G. G. Richards

    "The slag fuming process has operated for close to 70 years to recover zinc from lead blast furnace slag. The process is normally carried out through the batch treatment of slag by submerged injection

    Jan 1, 1996

  • SME
    Continuous Hard Rock Breakage And Its Potential Effect On Deep-Level Mining

    By N. G. W. Cook

    The conventional cyclic system of deep-level mining by drilling and blasting gives rise to an inadequate degree of stope sorting when mining thin reefs. This results in poor utilization of the capital

    Jan 1, 1969

  • SME
    Continuous High Gradient Magnetic Separation Pilot Plant: Machine Description And Mineral Processing Results

    By Bo Arvidson

    SALA MAGNETICS, INC. is now operating a 15 tph continuous high gradient magnetic separator, the SALA-HGMS® Mark III Carousel, as part of a complete mineral processing pilot plant installed at Sala&apo

    Jan 1, 1976

  • AUSIMM
    Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental Auditing

    By G McMillan, P Mulvey

    "Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant.  Tailings repository design is based upon geochem

    Jul 15, 2013

  • TMS
    Continuous Improvement in Peirce Smith Converter Design – Kumera’s Approach

    By Markku Rytkonen, Shaolong Chen, Ilpo Kylmäkorpi, Hannu Mansikkaviita

    Though the Peirce Smith (P-S) converter is a traditional type of furnace, continuous improvement in its mechanical and electrical design is still Kumera's approach. Efforts are made particularly on th

    Jan 1, 2009

  • CIM
    Continuous Improvement of the Return Air Raise Silencer System at Totten Mine

    By Andrew Dobson, Cheryl Allen, Enrique Acuña

    "Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p

    Jan 1, 2019

  • CIM
    Continuous improvement with the use of benchmarking

    By W. Almdal

    "To compete in the ever expanding global market, companies must continuously improve. Benchmarking, a tool that can help determine where the best areas for improvement are, is more than comparing meas

    Jan 1, 1994

  • SME
    Continuous Improvements In Mine Ventilation And Fire Simulation

    By Rudolf E. Greuer

    Modeling a mine ventilation system is a formidable mathematical problem requiring the solution of twice as many equations as there are airways with half of these being quadratic equations. The additio

    Jan 1, 1994

  • SME
    Continuous Manufacture Of Coke In A Rotary Hearth Furnace

    By Josh B. Taggart

    Some twenty to twenty-five years ago we saw the beginning of mechanization in our coal mines, It has now progressed to the point Chat as instruments of production the pick and shovel are things of the

    Jan 1, 1962