Search Documents

Search Again

Search Again

Sort by

  • CIM
    Phytomining of Ni from Mineralized or Contaminated Soils Available to Industry

    By Rufus L. Chaney

    A new technology is available to the Ni mining and remediation community to “phytomine” Ni from mineralized or contaminated soils using rare plants which hyperaccumulate Ni to over 1% of shoot dry mat

    Jan 1, 2016

  • SME
    Piedras Verdes: Mexico?s Newest Copper Mine

    By P. J. Rua

    The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o

    Jan 1, 2008

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
  • DFI
  • DFI
  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • AIME
    Pillar Drawing In Thick Coal Seams

    By G. B. Pryde

    IN laying out a new mine, provision should be made for the ultimate recovery of as much coal in any given bed as is consistent with safety and economic mining. Though each mining district, if not each

    Jan 2, 1921

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)

    By Yanske TR, Lane WL

    The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini

    Jan 1, 1998

  • CIM
    Pillar Extraction in Thick Coal at Canmore, Alberta, on Gradients Between 5 and 30 Degrees

    By H. G. Stephenson, C. W. Gregory

    "This article describes the methods used for pillar extraction in the Wilson Seam at Canmore Mines, Alberta. The Wilson Seam is extremely gassy and varies in thickness between 7 and 30 ft, with an ave

    Jan 1, 1972

  • TMS
    Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect Bioleaching

    By Theodore Ineich

    The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required

  • CIM
    Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit

    By V. Lakshmanan, Dan Mackie, J. Melnbardis

    "Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid

    Jan 1, 1984

  • SME
    Pilot Plant Development Studies On Mt. Laurier, Canada Graphite Deposit

    By V. I. Lakshmanan

    Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's

    Jan 1, 1984

  • ABM
    Pilot Plant Experience Using Stamped Charging Of Peruvian And Imported Coal Blends

    By Jorge Madias

    A Aceros Arequipa é a maior siderúrgica do Peru. A empresa opera uma planta em Pisco, com uma aciaria para 850.000 t anuais de aço líquido, e uma capacidade de laminação de 1.250.000 t anuais de produ

    Oct 30, 2017

  • SME
    Pilot Testing Of Column For Coarse Particles Flotation

    By H. Soto

    As a follow-up to a laboratory study, a pilot scale column for the flotation of coarse particles was designed and then tested in two different applications. In the first test, the concentration of a c

    Jan 1, 1993

  • IOM3
    Pilot-plant bio-oxidation of gold-bearing arsenopyrite concentrates

    By J. R. Budden, P. A. Spencer, J. Barrett

    The initially produced arsenic (III) is very toxic to the unconditioned culture but the mixed culture has the capacity to oxidise it to arsenic (V) in the presence of iron (III). It was possible to bu

    Apr 1, 1991

  • SME
    Pilot-Plant Pressure Filtration Of Coal-Preparation-Plant Refuse Slurry

    By D. W. Hutchinson

    One of the most important problems facing the coal industry today is the disposal of refuse from the coal preparation plants in a safe, economical, and efficient manner while complying with all legal

    Jan 1, 1977

  • TMS
    Pilot-Scale Treatability Study Of The Xidagou Mixing Metallurgical Waste Water

    By Xiang Zhu

    Xidagou is the largest waste water discharge channel of the Anshan Iron and Steel Complex (AISC) with average flow rate of 8000 cubic meters per hour, which is about 75% of the total effluent of the A

    Jan 1, 1994