Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    OFR-96(2)-78 Final Report For U.S. Bureau Of Mines - Volume II: Pilot Test Plan - 1. Introduction - 1.1 Purpose

    The purpose of Volume II of this study is to provide a general plan for the pilot testing of two materials which could be used to tag explosives for both pre- and postdetonation identification and of

    Jan 1, 1977

  • NIOSH
    OFR-96-79 Normalizing MESA-HSAC (A Mining Enforcement And Safety Administration-Health And Safety Analysis Center) Injury Data For Coal Mine Mobile Equipment Operators

    By Louis Schaffer

    This report characterizes several coal Dine mobile equipment operator populations with respect to age, mine experience, machine operator experience, and training. The information is used to demonstrat

    Jan 1, 1977

  • NIOSH
    OFR-96-81 Conceptual Designs Of Retaining Structures For Open Pit Backfilling

    By Serge Rudchenko

    A study to determine the potential use of retaining structures in open pit backfilling. Research and review of the open pit mine environment, mine waste disposal, and past and current use of retaining

    Jan 1, 1981

  • NIOSH
    OFR-96-83 A Study Of Explosion-Proof Enclosures

    By P. A. Cox

    The purpose of the initial research performed under this contract was to determine the margins of safety in explosion-proof (XP) enclosures, which were designed and certified according to the current

    Jan 1, 1982

  • NIOSH
    OFR-96-92 The Materials Flow Of Cobalt In The United States

    By Kim B. Shedd

    An initial evaluation of the flow of cobalt-containing materials in the United States was prepared. The following aspects of materials flow were included: cobalt released as a result of mining and pro

    Jan 1, 1992

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • NIOSH
    OFR-97(1)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System - Revision -1

    By L. J. Defferding

    This report documents the work performed by Battelle-Northwest and its sub-contractors in Phase I of a project to develop a cross pit conveyor system for the Bureau of Mines. The conveyor system des

    Jan 1, 1976

  • NIOSH
    OFR-97(2)-75 Report Of Qualification Test U.S. Bureau Of Mines Connector Development

    Three complete connector assemblies and ten separate contacts were submitted to a series of tests to establish the connector permissibility and compliance with the Bureau of Mines' research Contr

    Jan 1, 1972

  • NIOSH
    OFR-97-78 Design, Fabrication And Field Testing Of Remotely Operated Longwall Head/Tail Supports

    By Alfred Bellows

    The objective of this contract is to design, build and demonstrate a support system to improve roof control in the entries of longwall mines. The objective of this phase has been the detailed design o

    Jan 1, 1978

  • NIOSH
    OFR-97-79 Evaluation Of Roof Conditions From Bolting Machine Parameters

    By Richard W. Lusignea

    This report describes a program to evaluate the feasibility of determining roof features which occur in United States coal mines from changes in bolting machine drilling parameters. The ultimate purpo

    Jan 1, 1978

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • NIOSH
    OFR-98-77 Rapid Excavation Of Rock With Small Charges Of High Explosives

    By George B. Clark

    The purpose of this investigation was to determine the feasibility of designing and testing the elements of a small charge blasting system which will eliminate, or reduce to acceptable levels, most of

    Jan 1, 1976

  • NIOSH
    OFR-98-82 Compaction Criteria For Coal Waste Embankments

    By N. S. Shan

    This report presents the results of a study to determine compaction criteria for coal waste embankments. The purpose of this study is to evaluate the costs and resulting effects on the engineering pro

    Jan 1, 1981

  • NIOSH
    OFR-98-83 Evaluation Of Charged Walter Sprays For Dust Control

    By J. McCoy

    Charged sprays and fog have been evaluated for reducing respirable dust concen¬trations. Charged spray technology was reviewed for effectiveness, equipment and theoretical considerations. A mathematic

    Jan 1, 1983

  • NIOSH
    OFR-99-79 Development Of An Improved Machine Mounted Methane Detector System

    By Wilbur L. Webb

    This publication reports on the design, fabrication and test of an Improved methane monitor system for compliance to 30CFR75.313. The system will Initiate automatic shutdown of mining machinery when e

    Jan 1, 1978

  • NIOSH
    OFR-99-80 Uranium-Phosphorus Chemistry And Extraction Of Uranium From Uraniferous Phosphorites

    By M. Shamsuddin

    Information on total estimated uranium reserves and domestic requirements have been collected, A survey has been made on the possibilities of recovery of uranium from low grade and complex ore deposit

    Jan 1, 1980

  • NIOSH
    OFR-99-83 An Observational Study Of Classroom Health And Safety Training In Coal Mining

    By R. Michael Digman

    Few efforts have been undertaken to date to assess the quality of mandated coal mine health and safety training for new miners and for experienced miners. This study was concerned with the quality and

    Jan 1, 1982

  • CIM
    Oil and Gas Explorations -Eagle Plains Area, Yukon Territory

    By W. G. Campbell

    "The region discussed comprises approximately eight million acres spreading across the Arctic Circle in Yukon and North West Territories.Encouraged by four years of surface geological and geophysical

    Jan 1, 1960

  • CIM
    Oil and Gas in Ontario

    By R. B. Harkness

    Many of us are familiar with the history of oil in the Province of Ontario, but for the benefit of those who have never heard the story I will repeat it. In 185 7 J. H. Williams, of Hamilton, an old-c

    Jan 1, 1924

  • CIM
    Oil and Gas Possibilities in Western Canada

    By Link. Theo A.

    Introduction Since the discovery of a major oil pool at Leduc, Alberta, on February 13th, 1947, the long spell of 'oil drought' in Western Canada is now being turned into an oil and gas f

    Jan 1, 1949