Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    OFR-78-79 Development Of A High Energy Impact Breaker For Shaft Sinking - Initial Feasibility And Field Trials In A Rectangular Shaft

    By S. H. E. Phillips

    This report describes the initial feasibility, the development and the field demonstration of a system for shaft sinking employing a high energy mechanical impact rock breaker and a compatible muck di

    Jan 1, 1978

  • NIOSH
    OFR-78-81 Development Of A Visual Display And Control System

    The object of this program was to extend the capabilities of visual paging systems both in size and function. The system developed uses the mine pager phone line for communication, monitoring, and rem

    Jan 1, 1980

  • NIOSH
    OFR-78-83 Feasibility Study Of Automated Continuous Explosive Excavation Systems

    By E. Concha

    The concept of an Automated Continuous Explosive Excavation system (ACEE) for the underground mining applications of development drifting and room and pillar mining has been evaluated in comparison wi

    Jan 1, 1982

  • NIOSH
    OFR-78-84 Development Of A Conveyor Belt Service Machine

    By James L. Eirls

    Tracor MBA under a contract to U.S. DOI Bureau of Mines designed, developed, fabricated and demonstrated a conveyor belt service machine. It is self-contained, battery powered, rubber tired and capabl

    Jan 1, 1983

  • NIOSH
    OFR-78-86 Belt Conveyor Maintenance And Installation Procedures

    By Svend [Bue] Rondum

    The final report contains a summary of the work performed under this contract, In addition to the report itself, other products were derived from this effort. Several hardware items were prototyped fo

    Jan 1, 1982

  • NIOSH
  • NIOSH
    OFR-79(1)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 1 Of 2

    By Anthony E. Szczuka

    Two facets of surface mining were studied: feasibility of using training simulators to increase productivity of haulage trucks, front-end loaders, and shovels; and improving the efficiency of dragline

    Jan 1, 1976

  • NIOSH
    OFR-79(2)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 2 Of 2 ? Purpose

    By Anthony E. Szczuka

    The purpose of this design note is to document the data that has been received from manufacturers, coal companies, training centers, government agencies, etc., that pertains to the completion of the C

    Jan 1, 1976

  • NIOSH
    OFR-79-80 Improved Spontaneous Combustion Protection For Underground Metal Mines

    By Ralph B. Stevens

    The objective of this 20-month program was to define the relationships between mine ventilation, temperature, humidity, ore properties, material's used in mine operations, etc., and the spontaneo

    Jan 1, 1979

  • NIOSH
    OFR-79-81 Coal Mine Hazard Detection Using Synthetic Pulse Radar

    By James C. Fowler

    This report contains a description of the contract activities performed by ENSCO, Inc. under contract H0292025. The purpose of this project was to prove the feasibility of detecting hazards in a coal

    Jan 1, 1981

  • NIOSH
    OFR-79-83 Remote Monitoring Of A Coal Waste Impoundment In West Virginia

    By Gordon E. Green

    This report addresses remote monitoring of coal waste impoundments for stability. Existing automated geotechnical monitoring systems are described and reviewed along with details of instruments suitab

    Jan 1, 1982

  • NIOSH
    OFR-79-85 Strategic And Critical Materials Program Annual Report

    By R. E. Chaney

    This report summarizes the research on the Strategic and Critical Materials Program tasks conducted at the Idaho National Engineering Laboratory (INEL) between Mdy 1983 and April 1984. The work is

    Jan 1, 1984

  • NIOSH
    OFR-8(1)-76 Analysis Of Men, Materials And Supplies Handling Systems In Underground Metal And Non-Metal Mines ? Volume I ? Phase II Report ? System Improvements ? Introduction ? Study Background

    Productivity in underground metal and nonmetal mines is contingent upon work methods, mine layout, and ore handling techniques. One of the most important factors impacting productivity is the efficien

    Jan 1, 1975

  • NIOSH
    OFR-8-74 Coal Mine Combustion Products Identification And Analysis - 1.0 Abstract And Summary

    By K. L. Paciorek

    The aim of the present study is to determine on a gram per gram basis the toxic products of the thermal oxidative degradations of selected compositions. Four families of materials were investigated un

    Jan 1, 1973

  • NIOSH
    OFR-8-75 One-Hour Self-Rescue Breathing Apparatus - Summary

    By Yi-Shen Li

    This report has been prepared by Lockheed Missiles & Space Company, Inc. (LMSC), under United States Bureau of Mines Contract No. H0220040 dated 21 June 1972 for the design, development, fabrication,

    Jan 1, 1974

  • NIOSH
    OFR-8-81 Feasibility Of Control System Automation For A Drum Head Continuous Mining Machine

    By John E. Lambert

    Automatic control of drum head continuous mining machines was investigated as a means of reducing respirable dust generated and operator variabitity. Literature survey, manufacturer interviews and min

    Jan 1, 1979

  • NIOSH
    OFR-8-86 Bag Machine Dust Controls And Bag Sealing

    By T. L. Muldoon

    The bagging of dry pulverized products using fluidized air packers creates severe respirable dust problems in many surface mining operations. During bag filling, excess air and product blows by the ba

    Jan 1, 1985

  • NIOSH
    OFR-80(1)-77 Executive Summary - Research And Development Priorities Summary Report For March 1, 1974 To March 31, 1977 - Volume I ? Introduction

    By James J. Scott

    Eleven workshops were held in various locations throughout the country in an attempt to reach the many diverse groups working in various mineral commodity areas and special ties. These meetings were h

    Jan 1, 1977

  • NIOSH
    OFR-80(2)-81 Selective Interburden Handling Techniques - Volume II - Appendices

    By Robert L. Lappi

    Eight interburden handling concepts are developed for multiple seam area mine stripping operations in central and western United States. They are based on data gathered and analyzed during field surve

    Jan 1, 1980

  • NIOSH
    OFR-81(1)-81 Volume I - Precalculation Of The Effect Of Fires On Ventilation Systems Of Mines - Summary

    By Rudolf E. Greuer

    This report contains the practical application of a computer program for the simulation of ventilation systems under the influence of mine fires and other emergencies on five hardrock mines. The intro

    Jan 1, 1981