  • ABM
    Innovative Vacuum-tank Degassing Technologies: Well-established Metallurgical Performance Figures Achieved By Using Dry Mechanical Pumps

    By Franco Gandin

    With increasing demands for highly performing and at the same time efficient and running-costs saving vacuum-degassing equipment, dry mechanical pumps have been confirmed a proper choice to completely

    Aug 17, 2017

  • CIM
    Innuitian Region

    By Y. O. Fortier

    "ForewordTHE Arctic Archipelago and northern Greenland contain an orogenic region that is as much as 300 miles wide and over 1,400 miles long. It occupies much of what was formerly classified with the

    Jan 1, 1955

  • ABM
    Inovação No Processo De Peação De Bobinas De Aço Em Porão De Navio – Eliminação De Fitas De Aço

    By Bruno Sampaio Jannuzzi, Klayton Sebastião Leopoldino, Rodrigo Jorge dos Santos Arruda, Sergio da Cunha Motta

    Devido à necessidade de mitigar os riscos aos quais os empregados próprios e contratados ficavam expostos, durante o processo de peação de bobinas, em porões de navios, e também de reduzirmos os custo

    Oct 1, 2019

  • CIM
    Input Automation of the Computerized Pit Design System at Iron Ore Company of Canada

    By Desmond Y. M. Lee

    This paper presents a procedure to prepare input for the computerized pit design system at Iron Ore Company of Canada. The procedure is simple and requires very little training. Also, it is general en

    Jan 1, 1978

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • SME
    Inserted Mill Liners: A Concept Of Compromise

    By Charles B. Dugger

    Sacrificial linings for grinding mills have been a necessary state of the art of mineral dressing since the inception of comminution. Long recognized as the final link in energy transmission from powe

    Jan 1, 1979

  • AIME
    Inside a Metal

    By L. R. van Wert

    CAREFUL research into the nature of the metallic state has yet to discover, with any certainty, its essential quality. We do riot yet know, for sure, what it is that makes the metallic elements differ

    Jan 1, 1937

  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991

  • SME
    Inspection Equipment Study on Subway Tunnel Defects

    By Yadong Xue, Fei Wang, Hongwei Huang, Yan Sun

    "Increasing attention to subway tunnel maintenance is being paid with the high speed development of urban rail transit system in China. A novel moving tunnel inspection equipment based on machine visi

    Jan 1, 2016

  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • DFI
    Inspector?s Guide to Augered Cast-in-Place Piles

    By Matthew E. Meyer

    The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex

    Jan 1, 2010

  • DFI
    Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General

    This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines

    Jan 1, 2010

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless Soils

    By Mohammed Sakr

    The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing

    Jan 1, 2011

  • SME
    Installation and Preliminary Results of a Novel Fiber Optic Distributed Strain Monitoring System in an Active Underground Room and Pillar Metal Mine

    By Taghi Sherizadeh, Paul Brooks, Dogukan Guner, Samuel Nowak

    Large excavations are well known to result in rock mass deformations which can present challenging situations for mine personnel. Most of the currently available ground movement monitoring devices fai

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • ABM
    Installation Of A 350 T Bof Converter At Arcelormittal Poland

    By Günther Staudinger

    Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describe

    Jul 29, 2018

  • SME
    Installation Of A Supervisory Control System At A Gold Pressure Oxidation Plant (edba5c85-6442-4bfd-bdfb-2b55fb328e40)

    By M. Spangler

    FirstMiss Gold installed a supervisory control system based on Pavilion Technology's Process Insights neural network software and Oil System's PI data historian. The primary goal of the syst

    Jan 1, 1995

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • CIM
    Installation of Shaft Bottom Steel Prior to Shaft Sinking

    By D. M. Ziebarth

    "Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott

    Jan 1, 2019

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd