Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Heating and Physical Separation for Cobalt Recycling from Spent Lithium Ion Battery

    By S. Usui, Y. Shinohara, C. Tokoro, K. Horiuchi, S. Owada

    Process optimization of heating and physical separation for Cobalt (Co) recycling from spent lithium ion battery (LIB) was investigated. LiCoO2 in spent LIB was transformed to LixCoO2 which was more e

    Jan 1, 2015

  • CIM
    A New Approach to Overburden Stripping

    By R. E. Evans

    This paper contains an analysis of the geography and geology of the Black Lake area, Eastern Townships of Quebec, an outline of the work to be performed, an explanation of the design concept and how i

    Jan 1, 1967

  • CIM
    Balmer's in-pit coal conveyor: Improving haulage efficiency

    By C. H. van Eendenburg

    "Installation of a 3.6 km long raw coal conveyor in the Balmer open pit was undertaken to improve over-all haulage efficiency. This paper covers the rationale behind this project, system design and co

    Jan 1, 1990

  • CIM
    Statistical Review of Canada's Mining Industry, 1950

    By H. McLeod

    Introduction In the period from 1939 to the present, Canada has experienced a remarkable industrial expansion, rising to probably seventh in rank amongst world countries. In the early part of this pe

    Jan 1, 1951

  • CIM
    Remote Firmware Upgrading in the Emergency Communication Dispatcher's Broadcasting System Sat, Product of Telvis Ltd.

    By A. Kowalski

    Telvis Limited, manufacturer of an emergency communication dispatcher's broadcasting system, now introduces the possibility of a remote software upgrade to its devices. The paper presents methods

    Aug 1, 2013

  • CIM
    Triboelectric Belt Separator for Beneficiation of Fine Minerals (9aecc8ca-7bc0-41bc-8b15-775052b522c2)

    By James D. Bittner

    Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate fi

    Nov 1, 2011

  • CIM
    General Geological Features of the Mining Fields of Manitoba and Adjoining Districts

    By J. F. Wright

    Introduction Previous to 1924 the mining fields of Manitoba and adjoining territory had not been prospected in detail, and the reports of the exploration of the mineral discoveries to that date had b

    Jan 1, 1935

  • CIM
    Air-decking principle and its applications in production and presplit blasting

    By P. Pal Roy, R. B. Singh

    "This paper focuses on a number of interesting results to establish the theory and principle of air-deck blasting. It also gives the mechanism of breakage that takes place in air-deck blasting under v

    Jan 1, 2001

  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • CIM
    Trends in Surface Drilling and Blasting

    By A. Bauer

    This paper describes the trends in recent years in explosives formulated to produce larger blast-hole spacings and over-all lower drilling and blasting costs in hard formations. A consideration of cur

    Jan 1, 1968

  • CIM
    Geothermal Research in Canada

    By Alan Jessop

    A small group has been set up at the Dominion Observatory, Ottawa, to make a survey of terrestrial heat flow throughout Canada. Terrestrial heat flow is the heat rising from the interior of the earth

    Jan 1, 1964

  • CIM
    Opportunities for cost savings in the mining industry (9eda6e64-d7a6-4932-a44c-2e23b1f05ffb)

    By Robert D. McKellar, Luke Frawley, Okrasa. Richard

    "The resource industries in Canada are facing increasing global competition and stringent environmental regulations. This has made it essential for companies to lower operating costs wherever possible

    Jan 1, 1996

  • CIM
    Microstructure and Strength of Mg-Zn-Ho Alloys Containing Quasicrystal Phase

    By A. Singh

    Two alloys Mg96.9Zn2.7Ho0.4 and Mg93Zn6Ho have been processed by direct extrusion at 300°C and 200/230°C to produce various microstructures containing icosahedral quasicrystalline phase with different

    Jan 1, 2006

  • CIM
    SAG and Ball Mill Circuit Layout and Design

    By L. Dufourm

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Manpower in the Canadian Mining Industry

    By M. A. Upham

    "MINING is Canada's second largest basic industry, producing material with a gross value of 2.5 billion dollars, led only by agriculture with 2.9 billion dollars. It pro-vides employment, directly and

    Jan 1, 1967

  • CIM
    Dynamic Planning of Construction Activities Using Hybrid Simulation

    By H. Alzraiee

    Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects. However, the underlying model of these traditional methods often seems to fail to represent re

    Aug 1, 2013

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    Why Aren?t We Using More Thermal Coal in Canada? ? The Real Reasons

    By Roger K. M. Bellows

    The last coal-fired power plant to be built in Canada came into operation in 1994. Since then, Canada?s electricity requirements have grown substantially but no new coal-burning plants have been built

    May 1, 2001

  • CIM
    Extraction of Dimension Stone as a Co-Product of Civil Engineering Works: A Case Study

    By E. Lovera

    ABSTRACT: The current study analyzes the feasibility of an odd operation: to obtain, using a properly tailored drilling and blasting scheme, blocks suitable for the production of dimension stone from

    Jan 1, 2011

  • CIM
    Sinking of Two Freeze Shafts Using Shaft Boring Roadheader (SBR) Technology for the Slavkaliy Nezhinsky Potash Mine in Belarus

    By Frank Otten, Jochen Greinacher

    "In July 2017, Deilmann-Haniel signed a contract with IOO Slavkaliy to sink two 750 metre (m) deep freeze shafts for the Nezhinsky Potash mine in Belarus. This is the second shaft project where this t

    Jan 1, 2019