Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine

    By J Harris, J Turner, P Kirsch

    Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment

    Nov 5, 2014

  • AUSIMM
    Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia

    By E Hernandez, I Agustian, W Kusumohastuti

    PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi

    Mar 24, 2014

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Importance of the simple shear loading direction to the stability of tailings storage facilities

    By D Reid

    The engineering properties of soils and tailings often exhibit significant anisotropy. One area where this has been well documents is undrained shear strength. Materials sheared in directions close

    Jul 23, 2018

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • AUSIMM
    Performance of the IsaMills in the George Fisher Flowsheet

    By M Gao

    Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation

    Jan 1, 2000

  • AUSIMM
    The Re-opening of CSA Mine, Cobar NSW

    By M Scamardella

    The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of

    Jan 1, 2000

  • AUSIMM
    Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic Analysis

    By M Paakkunainen

    Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several

    Jan 1, 2005

  • AUSIMM
    Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to Implementation

    Tailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of

    Jan 1, 2009

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • AUSIMM
    Contract Mining Lihir Gold Mine

    Lihir Gold Mine is situated in a dormant volcanic caldera on a small island off PNG. Not æextinctÆ but dormant. Current ground temperatures are up to 150 degrees Celsius with active geysers in the wor

    Jan 1, 1999

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    2001 is Here Now - Teleoperation and Automation of UG Vehicle

    Teleoperation is one method by which an operator can remotely control and monitor a vehicle. The operator monitors the status and progress of the remote vehicle by watching the video transmitted from

    Jan 1, 1998

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023