Search Documents

  • NIOSH
    RI 3830 Electrolytic Manganese in Acid-Steel Tests at Atlas Steel Casting Co. and the Detroit Steel Casting Co.

    By R. T. C. Rasmussen

    "INTRODUCTION This is the second report of investigations describing tests in full-scale commercial heats of steel-using electrolytic manganese having a purity of about 99.95 percent, produced in the

    Nov 1, 1945

  • SME
    Microtunneling For Utilities Under Harold Railroad Interlocking

    By William Reininger

    Microtunneling provides a necessary solution for multiple utility crossings associated with the New York Metropolitan Transportation Authority Capital Construction Company?s (MTACC) Eastside Access Pr

  • NIOSH
    Ergonomic Risk Factors – A Study Of Heavy Earthmoving Machinery Operators

    By N. Kumar Kittusamy

    ALTHOUGH MANYSTUDIES HAVE SHOWN an association between operating heavy construction equipment and symptoms of musculoskeletal disorders (MSDs), little research has been performed that systematically c

  • NIOSH
    OFR-51-82 Technology For Environmental Noise Control In Surface Mines

    By Michael A. Staiano

    The objective of this study was to determine the magnitude and sources of environmental noise from mining operations near populated areas, to de-scribe monitoring techniques, and to identify applicabl

    Jan 1, 1981

  • ISEE
    Predicting and Controlling Ground Vibration

    By James W. Reil, Douglas A. Anderson

    Blast vibration monitoring has generally been regarded as a necessary evil. New instrumentation and computer programs can change this. Rather than the usual trial and error methods to control vibratio

    Jan 1, 1989

  • AUSIMM
    The Aluminium Smelter at Tiwai Point

    My speech this morning is not a technical one, rather I will aim to tell you about the New Zealand Aluminium Smelters Limited and how I see it fitting into the Western World aluminium scene.

    Jan 1, 1983

  • SME
    Looking Back at 1942-1946

    Although out of the ordinary, MINING ENGINEERING is pleased to present a few photographs that typify Western US mining activity during WWII. The photographs, taken by R.G. Zellers at Colorado minin

    Jan 6, 1983

  • NIOSH
    RI 5441 Damping Capacity--Its Measurement And Significance ? Summary

    By J. W. Jensen

    This report was prepared as a background reference for future publica¬tions concerning the damping capacity of metals and alloys. It contains a broad description of the theory and methods of measuring

    Jan 1, 1959

  • NIOSH
    RI 3465 Methods Of Rock-Dusting American Coal Mines ? Introduction

    By J. J. Forbes

    Investigations by the Bureau of Mines and by mining-research departments of European countries have established definitely the value of rock-dusting to prevent or limit the propagation of coal-mine ex

    Jan 1, 1939

  • NIOSH
    IC 8205 A Study Of Dust-Control Methods For Continuous Mining Of Coal (8cfaa2ab-d561-41e1-a166-5f1af4dbf9ca)

    By Floyd G. Anderson

    A study was made of the effectiveness of dust-control methods being employed in connection with continuous-mining operations. Airborne dust exposures of workmen and dust loadings of return air were de

    Jan 1, 1963

  • IIMP
    Simulación de un sistema de perforación hidráulica: Jumbos

    By Ángel Bravo

    La simulación es un programa virtual que permite evaluar los costos de perforación y soldadura para el costo final del proyecto minero. El modelo fue diseñado en hoja electrónica, cuyos datos de entr

    Sep 13, 2001

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • AUSIMM
    Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and Developments

    Igneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in

    Sep 13, 2010

  • CIM
    Cemented Sand Fill at lnco

    By J. McCreedy

    "The addition of Portland cement to hydraulic sand fill has resulted in the production of stable and self-supporting cemented sand fill. The use of cemented fill in the mines of The International Nick

    Jan 1, 1966

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011

  • TMS
    Continuous Casting of Steel

    By R. D. Pehlke

    The history and present status of continuous casting of steel are reviewed, including a genera 1 description of current processes. Plant layout, process development and elements of machine component d

    Jan 1, 1985

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • NIOSH
    RI 3465 Methods Of Rock-Dusting American Coal Mines ? Introduction (ebff49c8-8566-4bb9-8314-d79df6ddf769)

    By J. J. Forbes

    Investigations by the Bureau of Mines and by mining-research departments of European countries have established definitely the value of rock-dusting to prevent or limit the propagation of coal-mine ex

    Jan 1, 1939