IC 8891 Premining Investigations For Hardrock Mines - Proceedings: Bureau Of Mines Technology Transfer Seminar, Denver, Colo., September 25, 1981These proceedings consist of papers presented at a Bureau of Mines Technology Transfer Seminar in September 1981 for the purpose of disseminating recent advances in mining technology in the area of pr
Jan 1, 1982
-
Design Of Permanent Intruded Plugs At South Deep Gold MineBy G. S. Littlejohn
In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1
Jan 1, 2006
-
RI 3450 A Washability Study Of The Black Creek Coal Bed At Yolande No. 6, Rockcastle, Ala. ? Introduction (9b60ba7b-24d3-4a5a-a707-d33e33aefeee)By B. W. Gandrud
This is the third report published by the Bureau of Mines concerning the washability of Black Creek coal. Both of the former reports.5/6/ dealt with the Black Creek coal at the Bradford mine, Dixiana,
Jan 1, 1939
-
The Design Of A Single Aggregate Concrete On Cullinan Diamond MineA single aggregate mix design was developed based on a slag/Portland binder blend and crusher sand. The primary design criterion, after performance, was the fluidity of the shotcrete and concrete prod
Jan 1, 2006
-
Simulating Concentrators From Feed To Final Products Using A Multi-Component MethodologyThe ability to optimise a concentrator from mill feed to final products requires a simulator which integrates comminution, classification and separation modelling. In order to model this range of proc
Feb 27, 2013
-
RI 7964 Physical Property Data on Coal Waste Embankment MaterialsBy Richard A. Busch
Inadequate engineering design criteria for coal refuse embankments has allowed hazardous impoundment structures in coal mining areas to be created. A necessary first step to develop adequate design cr
Jan 1, 1974
-
Advances in Copper Anode Reverberatory Furnace PracticeAt Copper Refineries Pty. Ltd., Townsville, two reverberatory furnaces of 420 tonnes capacity are used to melt 210000 tonnes/year of copper for subsequent anode casting. When the refinery commenced pr
Jan 1, 1977
-
Effect of pH and Chain Length on the Flotation Separation of Fluorite from its Synthetic Mixtures with Calcite and Dolomite with Imino-Bis-Methylene Phosphonic AcidEffect of pH and Chain Length on the Flotation Separation of Fluorite from its Synthetic Mixtures with Calcite and Dolomite with Imino-Bis-Methylene Phosphonic Acid
Sep 13, 2010
-
Technical Notes - Energy Requirements in Size ReductionBy Y. Oka, H. Majima
When a rock particle is subjected to an external force, internal stresses and deformations are experienced by the particle. Assuming that the breakage of a rock is mainly due to tensile stresses gener
Jan 1, 1970
-
Slope Optimization At Escondida Norte Open PitBy Manuel Rapiman, Ricardo Sepulveda
The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in
Jan 1, 2006
-
Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case StudiesBy John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
Radio Controlled Detonators and Sequential Real Time Blast ApplicationsBy J M. Laboz Bernard
Among the numerous technical evolutions in the blasting environment we are going to describe below the concep
Jan 1, 1995
-
Completion of the New Zealand Coal Resources SurveyThe Coal Resources Survey commenced in 1974 as a search for Huntly Power Station coal, but soon developed into the most detailed regional coal search programme to be instituted in New Zealand. The pro
Jan 1, 1987
-
Influence of concentrate discharge launder and washing-water system on metallurgical performence of flotation columns: preliminary results of trials in zinc circuit of Aznalcollar concentratorBy J. M. Jimenez, G. D. Schena, A. J. Cazorla
A full-scale Deister column was operated in parallel with the conventional cleaning bank of cells and a pilot Jameson cell in parallel with the conventional rougher cells. Flotation column performance
Jun 18, 1905
-
Stope Filling with Thickened Classified Flotation TailingsBy Yates C, Gillie E. W, Finucane K. J
During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka
Jan 1, 1945
-
OFR-42(1)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - Shuttle Car Reel Test Unit - I. IntroductionSevere whipping of shuttle car trailing cables occurs when the car stops suddenly or reverses direction. This causes cable damage, and can seriously injure personnel near the cable. FMC has contra
Jan 1, 1972
-
IC 7854 Exploration Development, And Costs Of The Stormy Day Tungsten Mine, Pershing County, Nev. ? SummaryBy A. C. Johnson
This report describes exploration, development, and exploitation methods, and summarizes costs at the Stormy Day mine, which was discovered in 1941. Several shipments of tungsten ore were made in 1944
Jan 1, 1958
-
OFR-97(A)-82 Improved Solution Mining Production Cost Model - IntroductionOn April 1, 1982, the Bureau of Mines and the Department of Energy entered into an Interagency Agreement to develop an enhanced computer cost model for uranium in situ leach mining. The original compu
Jan 1, 1982
-
Discussion of Papers - The Use of Curvilinear Multiple Correlation Analysis In Computer Simulation of Complex ModelsBy W. H. Yarroll Discussion by W. A. Griffith
W. A. Griffith (Head, Research Department, Phelps Dodge Corp., Morenci, Ariz.) - It is gratifying to see the increasingly common use of classical statistical procedures by metallurgical researchers. M
Jan 1, 1969
-
Mortimer Smelter: Operations DescriptionBy C. Sima, M. Legoabe
Keywords: Pyrometallurgy, furnace, platinum Mortimer Smelter is one of the three smelting operations in the Anglo Platinum Group. It is located in the Limpopo Province, approximately 100 km north
Jan 1, 2006