Search Documents

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • NIOSH
    RI 9202 - Control of Airborne Respirable Dust in the Face Area With Water Sprays Using a Full-Scale Laboratory Model

    By L. Cheng

    This report presents the results of a Bureau of Mines laboratory investigation of the effect of water sprays in reducing respirable dust that escaped the face area of a full-scale wooden model of a mi

    Jan 1, 1988

  • NIOSH
    OFR-43-84 Noise Control Of Rubber-Tired Front-End Loaders Used In Surface Mining

    By N. R. Dixon

    This report summarizes all work performed under U.S. Bureau of Mines Contract No. J0395028, "Noise Control of Rubber-Tired Front-End Loaders Used in Surface Mining. " Two loaders, a Caterpillar 988 an

    Jan 1, 1983

  • IIMP
    Estrategias de planeamiento de minado para maximizar el valor de la operación minera de Tintaya

    By Víctor Guimaraes

    El presente texto señala las estrategias de planteamiento de minado en la minera Tintaya con el objetivo de maximizar el valor neto de la operación minera y a un nivel aceptable de riesgo. Este ciclo

    Sep 9, 2007

  • SME
    Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case Study

    By Kevin Andrews, Terry Hamric, Scott Nelson

    "Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini

    Jan 1, 2019

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • AUSIMM
    Origin of the "Jasper Bars" of Western Australia

    The notes from which this paper has been prepared were set down at the time of the author's departure from Australia in 1935. Mr. Frank Forman, Government Geologist of Western Australia, who has

    Jan 1, 1939

  • NIOSH
    RI 3590 Temperatures Of Natural-Gas Pipe Lines And Seasonal Variations Of Underground Temperatures ? Introduction

    By W. M. Deaton

    [The formation of gas hydrates in natural-gas pipe lines depends on temperature and pressure conditions in the lines as well as on the presence of condensed water. The operating pressure in a pipe lin

    Jan 1, 1941

  • AUSIMM
    Application of Research Principles to Identify Process Improvement at Sunrise Dam Gold Mine

    By N Clarke, G R. Ballantyne, M S. Powell, P Elms, A Anyimadu

    AngloGold Ashanti Ltd nominated Sunrise Dam Gold Mine as a case study via their involvement with the long-running Australian Mineral Industry Research Association (AMIRA) International P9P research pr

    Sep 7, 2015

  • AUSIMM
    Blast Furnace Department at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    A BRIEF DESCRIPTION OF TELPHER HANDLING AND BLAST FURNACE EQUIPMENT.The various sections will be described in the following order:(a) Telpher Handling and Storage Bins.(b) Blast Furnaces.(c) Slag Disp

    Jan 1, 1937

  • SAIMM
    Electrometallurgical Relationships In Electric Smelting Furnaces

    By J. Persson, N. G. Bliss

    Electric furnaces used for smelting and those used for scrap melting exhibit different performance profiles in terms of electrical characteristics. However, the underlying principles are the same f

    Jan 1, 2004

  • NIOSH
    IC 8447 Secondary Gold In The United States

    The Bureau of Mines analyzed the cycle of secondary gold to determine the quantity of gold not being recovered from scrap, and to identify areas for research to increase the supply of gold from scrap.

    Jan 1, 1970

  • TMS
    Magnetostriction And Magnetic Properties Of Polycrystalline Pdx (X= Ni, Co, Fe) Alloys

    By Pinai Mungsantisuk

    Keywords: Pd-Ni alloys, Pd-Fe alloys, Pd-Co alloys, Magnetostriction, Magnetic Properties The presence of congruent melting minima, the occurrence of ferromagnetic transition over a large composit

    Jan 1, 2005

  • IOM3
    Ore reserves: the mining aspects

    By H. K. Taylor

    Ore reserves are inadequately defined. Geological reconnaissance and pre-feasibility mining work generate a broad range of valid tonnage estimates, many published for the benefit of various interests,

    Sep 1, 1991

  • CIM
    Deep Exploration of the "Brunswick Horizon", Bathurst District Northern New Brunswick

    By J. J. Hussey

    "Abstract-The ""Brunswick Horizon"" an informally named ore-bearing unit near the top of the Nepisiguit Falls Formation in the Ordovician Tetagouche Group, hosts the Brunswick No. 6 and No. 12 base-me

    Jan 1, 1992

  • NIOSH
    RI 7011 Computer Techniques For Predicting Three Phase Flow In Five-Spot Waterfloods

    By R. V. Higgins

    This report presents computer instructions for calculating the performance of three-phase flow of gas, oil, and water. The calculated results for an illustrative example are presented. The example is

    Jan 1, 1967

  • IOM3
    Significance for gold exploration of structural styles of auriferous deposits in the Archaean Bulawayo-Bubi greenstone belt of Zimbabwe

    By P. E. J. Pitfield, S. D. G. Campbell

    The regional structure of shear and deformation zones in the belt, which is recognisable in plan view on Landsat TM images, is interpreted in terms of a conjugate-shear model. Gold mineralisation is r

    Apr 1, 1996

  • AUSIMM
    Tellurium in the Ores of the Hauraki Goldfields

    New Zealand has often been quoted by metallurgists and others as one of the countries in which Tellurium is found, and locally it has been recorded that appreciable quantities of tellurium have been m

    Jan 1, 1901

  • SME
    Pipe Conveyor And Belt: Belt Construction, Low Rolling Resistance And Dynamic Analysis

    New developments in the pipe conveyor and belt are advanced to address the growth in the capacity, length and complexity of pipe conveyor systems. Improved belt construction can offer better stability

    Jan 1, 2012

  • AUSIMM
    The Application of the Environmental Assessment Procedures to Licensing for Minerals, Petroleum and Geothermal Energy

    By D Thorburn

    This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The

    Jan 1, 1990