Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Measurement of Blast Vibrations: Compliance under the RMAWith the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
State-Of-Art Shaft System As Applied To Palabora Underground Mining ProjectAs the world continues to face the turmoil of the economic environment, legislative prerequisites and physical conditions the intervention of technological development is vital for the continuation of
Jan 1, 2000
-
Interface ManagementBy R. Simonson
Agenda ? Need and Introduction ? Interface Management Programs ? Outcomes of Successful Interface Management ? Key Success Factors ? Lessons Learned ? Concluding Remarks Need for Interface Mana
Aug 1, 2013
-
Aspects of Mining at Ok TediBy Zwaan J, Kepa J
Ok Tedi mine has become one of the major copper producers in the world. In the process of becoming of age, it overcame the challenges of operating in a locality which is young in geological terms,
Jan 1, 1991
-
Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New ZealandVein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro
Jan 1, 2002
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Bioleaching Metals from Waste Printed Circuit Boards and the Shapes of MicroorganismsBioleaching Metals from Waste Printed Circuit Boards and the Shapes of Microorganisms
Sep 13, 2010
-
Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance TechniquesBy S. Makni, A. Faucher, F. Robichaud, A. Bouajila
"Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge
Jan 1, 2012
-
Destress blasting in hard rock mines—a state-of-the-art reviewBy M. R. Saharan
A brief overview of rockburst control measures is presented. The paper then elaborates on one key rockburst control measure, which is known as destress blasting. A historical background of the techniq
Jan 1, 2006
-
Discussion - Of Mr. Lee's Paper on The Corrosion of Water-Jackets of Copper Blast-Furnaces (see Trans., xxxviii., 877)C. D. Demond, Anaconda, Mont. (communication to the Secretary*) :—In order to throw some light on this interesting subject, a series of experiments were made with strips of mild steel, containing abou
Jan 1, 1909
-
Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM ProjectBy Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming
"This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui
Jan 1, 2015
-
Lithostratigraphic and structural controls on distribution of As and Au in southwest Southern Uplands, ScotlandBy P Stone, J. M. Cook, P. R. Simpson, C Mcdermott
Paper presented at the conference Economic geology in Europe and beyond II, models for mineral deposits in sedimentary basins, held in Keyworth, UK, 13-14 April 1994. The SW part of the Southern Uplan
Aug 1, 1995
-
Mineralogy of Some Ceramic Clays from the Adelaide AreaBy Lancucki C. J, Nickson N. M
X-ray diffraction and differential thermal methods were used to determine the mineralogy of some clays used by the heavy clay industry in the Adelaide area. A detailed analysis was made of the mineral
Jan 1, 1963
-
Influence of Frothers on Bubble Shape and Velocity Close to the Generation PointInfluence of Frothers on Bubble Shape and Velocity Close to the Generation Point
Sep 13, 2010
-
Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
A Successfully Service Tested Hard Iron With Superior Abrasion And Corrosion Resistance Is Available For The Mineral Processing Industry.By G. A. Calboreanu
One way of cost reduction is attained when using materials with improved erosion ? corrosion resistance. For many years hard irons successfully answered the Mining Operation needs however application
Jan 1, 2012
-
Mount Morgan Ore ConcentrationBy Wilson O. A
TABLE OF CONTENTS1. Introductiona. Process Changes since 1939.b. Current Practice.2. Ore Characteristicsa. Copper Minerals.b. Gold Occurrence.3. Treatment of High Grade Acid Orea. The Ore Treatment Pl
Jan 1, 1952
-
Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
-
Annual Review 2011 Mining And Exploration Overviews - Exploration ReviewBy D. R. Wilburn
his summary of international mineral exploration activities for the year 2011 draws upon available information from industry sources, published literature and U.S. Geological Survey (USGS) specialists
Jan 1, 2012
-
Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite FlotationEffect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation
Sep 13, 2010