Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
IC 8327 An Analysis Of The Pacific Northwest Lead-Zinc IndustryBy Richard W. Knostman
A study was made of the factors affecting lead and zinc production in the Pacific Northwest. Costs, ore reserves and potential resources, and domestic demand were analyzed. It was concluded that a
Jan 1, 1967
-
Pullout Test Of Coir Fiber To Evaluate The Interface Strength In Polyester CompositesBy Sergio N. Monteiro
Polymeric composites reinforced with natural fibers are increasingly been used in several engineering applications, from automotive parts to building construction elements. In addition to the relative
Jan 1, 2006
-
Effect Of Dissolved Precipitating Ions On The Settling Characteristics Of Copper Sulphide ? SynopsisBy M. Nduna
Surface properties of metal sulphides have a great significance in various areas of engineering and science, such as acid mine drainage, contaminant sorption, and metal separation. In various attempts
Jan 1, 2013
-
RI 7935 Drilling and Sampling Tertiary Gold-Bearing Gravels at Badger Hill, Nevada County, Calif.By Russell R. McLellan
As part of an effort to develop new or improved placer mining technology in the Tertiary gold-bearing channel gravel of northern California, the Bureau of Mines conducted investigations at the old Bad
Jan 1, 1974
-
Land Reclamation at Waihi û PrinciplesBy R B. Stewart
Where pasture production is the intended land use of the areas to be reclaimed, the creation of a suitable growing +medium is a major objective. To achieve this land reclaimers require a sound underst
Jan 1, 1991
-
Characteristics of late Archean plutonic rocks from the Abitibi and Pontiac sub provinces, superior province, CanadaBy John N. Ludden, Maurice Rive, Hillar Pintson
"Quelques soixante-dix-sept plutons présents dans la Sous-Province de Pontiac et dans la partie centrale de la Sous-Province de I’Abitibi ont fait I ’objet d’une reconnaissance systématique. Ils ont é
Jan 1, 1990
-
RI 5107 Chromium-Base Alloys ? Introduction And SummaryBy R. G. Nelson
This report covers investigations of the Bureau of Mines for the period of June 15, 1952, to June 15, 1953, on a research project for the Materials Laboratory, Wright Patterson Air Force Base, Dayton,
Jan 1, 1955
-
New Assessment Technique for LHD Vehicle VisibilityOver the last three decades, the mining industry has been moving towards more underground mechanized mining methods and the number of LHD vehicles utilised has increased. The growth of mechanization a
May 1, 2004
-
25th International Conference On Ground Control In Mining - A Retrospective Assessment Of Longwall Roof Support With A Focus On Challenging Accepted Roof Support Concepts And Design PremisesBy Thomas M. Barczak
The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a
-
Millpebs Testing at Brunswick ConcentratorBy Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper
"The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr
Jan 1, 2006
-
Truss Systems For Longwall Tailgate Support - UpdateBy John C. Stankus
At the 13th Conference on Ground Control in Mining, a paper was presented detailing a successful test in which a new truss system was utilized, in lieu of wood cribs, for tailgate support in the Pitts
Jan 1, 1995
-
Influence of Presence of Overlaying Sand on Rock Socket Length of Bored PileBy Priyadharshini M. R., Premalatha K
"Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t
Jan 1, 2014
-
Rock Mechanics - Stress Required to Initiate Core DiscingBy V. J. Parks, Leonard Obert, A. J. Durelli
The state of stress in the region where core discing initiates has been investigated through the use of three-dimensional photoelastic models and the results of this study have been compared with thos
Jan 1, 1969
-
Drilling – Equipment, Methods and Materials - Laboratory Studies of Formation Damage in Sands Con...By A. E. Anderson, H. J. Hilll
Laboratory data for 155 field muds and 77 .shales have been used to develop correlations to estimate the net streaming potential component of the SP. Analysis of these data and comparison with field t
-
Government Coodrination and Liaison: The Lihir ProjectBy Van Dusen M
The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t
Jan 1, 1991
-
A Road Embankment Failure Near Pentalia In Southwest CyprusBy P Papanastasiou, J Hadjigeorgiou, E Kyriakou
The south west area of Cyprus has a long history of slope instability problems. The location and extent of these landslides has been influenced by ground morphology, geological structure and the prese
Jan 1, 2006
-
Outsourcing in the Mining Industry: Decision-Making Framework and Critical Success FactorsBy C. J. H. Steenkamp
Theoretically, the main driver behind a mining operations? sourcing decision should differ from company to company, and within a company from project to project, but in reality it often relates to cos
Jan 1, 2014
-
Current State Of Disc Cutter Design And Development DirectionsBy Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009