Search Documents

  • AUSIMM
    Geometric and Dynamic Analysis of some Faults in the Western Coalfield of New South Wales

    By Creasey J. W, Huntington J. F

    Faults cutting the Lithgow and Katoomba seams in some collieries of the Western Coalfield can be classified, on the basis of spatial pattern, into three principal groups: meridional swarms of closely

    Jan 1, 1981

  • SME
    Porphyry Copper-Gold Deposits of the Southwest Pacific

    By R. L. Andrew

    The southwest Pacific has produced at least four of the world’s premier porphyry copper-gold deposits, and the current level of exploration is likely to produce even more. An appreciable amount of gol

    Jan 1, 1995

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • SME
    The Stormwater Management and Road Tunnel (SMART), KualaLumpur, Malaysia—A Unique Use of Tunnel Space for both Traffic and Flood Water

    By Christopher J. Bambridge, Lee Seng Hoor

    The Stormwater Management and Road Tunnel (SMART) Tunnel is a world first in the use of tunnel space transmitting both road and water through the same spatial envelope. The unique aspect of the SMART

    Jan 1, 2005

  • AUSIMM
    The System of Costs Keeping at the Broken Hill Junction North Mine

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1912

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • AUSIMM
    Using liquid nitrogen for the inertisation of goafs

    By D Caley

    During the response to the Moura No 4 disaster, use was made of the New South Wales Mines Rescue Service’s ‘Mineshield’ inertisation equipment. The equipment had to be transported from Newcastle, appr

    Aug 28, 2017

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • IOM3
    Utilization of voids for development and gas generation following waste disposal

    By J. A. Every-Brown

    Case studies are presented of three derelict sites in Kent and Essex that provide a good cross-section of opportunities for second-generation commercial uses of former chalk, limestone, clay and grave

    Aug 1, 1994

  • SME
    Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in Australia

    By John Zeni

    In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the

    Jan 1, 2001

  • SME
    Strong reserve bases are key to oil companies surviving over the long-term

    By Wilfred P. Schmoe

    Introduction An integrated oil company has two options in approaching strategic planning. It has to decide whether it is in business for the long-term. I state this in all seriousness. Those who help

    Jan 6, 1985

  • AIME
    Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood

    By B. H. Caudle, L. G. Loncarie

    Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar

  • AIME
    Development and Operation, Clifton Mine Division, Hanna Ore Co.

    By GUY B. HUNNER

    THOSE magnetite ore bodies comprising the Clifton Mines are situated in the south central part of St. Lawrence County, New York, on the western slope of the Adirondack Mountains. The topography is mad

    Jan 1, 1943

  • CIM
    Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet Plant

    By Jean-Pierre Côté, Alexandre Noiseux

    "Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d

    Jan 1, 2010

  • CIM
    A Short History of Mineral Processing

    By Fathi Habashi

    "Crushing and grinding of ores and their beneficiation by washing away gangue minerals has been practiced since ancient times. Primitive crushing was done by hand pounding the ore with a hard stone th

    Jan 1, 2009

  • AUSIMM
    The Production of Gold in Australia

    GOLD has played a part in the development of Australia. The total yield exceeds SIX hundred million pounds sterling, while the glamour of gold-mining and the unfailing demand for the product have enha

    Jan 1, 1924

  • IOM3
    Regional polyphase and polymetallic vein mineralization in the Caledonides of the central Wales orefield

    By J. S. Mason

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. Detailed paragenetic studies of the post-tectonic fracture-hosted vein min

    Jun 19, 1905

  • AUSIMM
    Filtration of coal washery slurries using a horizontal belt filter

    By Slechta J. J

    An evaluation of a pilot scale Delkor horizontal belt filter at Bellambi's South Bulli Colliery showed high productivities and low moisture contents for a range of feed slurries. When treating fl

    Jan 1, 1986

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920