Search Documents

  • IMPC
    Research on the Mineral Processing Technique of Recovery for Refractory Oxidized Antimony from Tailings

    By L. X. Yu

    As is known, the oxidized antimony and antimonate are hard to treat. A new combined mineral processing flowsheet which is controlled in grinding and classification ?bulk floatation?gravity separation

    Jan 1, 2014

  • NIOSH
    RI 5067 Petroleum Sulfonate Flotation Of Beryl - Introduction And Summary

    By S. M. Runke

    An ever-increasing demand for beryllium and beryllium alloys has directed attention to the milling of low-grade domestic deposits as a possible means of supplying part of the Nation's ore require

    Jan 1, 1954

  • IIMP
    Determinación de plomo, cadmio y zinc en muestras atmosféricas

    La protección de la salud del minero es la principal labor de la higiene industrial donde se requiere la cooperación de múltiples disciplinas como la medicina, ingeniería y química. En este sentido, e

    Jul 20, 1957

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • SME
    Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021

    By J. Rostami, P. P. Nelson, A. Khetwaln

    Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in

    Jun 13, 2021

  • TMS
    Solvent Extraction Technology for the Extraction of Nickel Using LIX®84-I. An Update and Circuit Comparisons

    By J. Murdoch Mackenzie

    Two commercial nickel solvent extraction plants treating laterite leach solutions and using LIX®84-I have been operated in Australia. These circuits employ similar extraction chemistry but differ in t

    Jan 1, 2004

  • CIM
    Methods of Breaking and Handling Ore at East Geduld

    By A. S. Knight

    THE breaking and handling of ore is obviously the most important consideration when the layout of a new mine is contemplated. The problem must be attacked with due regard to the claim area of the prop

    Jan 1, 1942

  • SME
    Upgrading Of High Moisture Content Lignite Using Saturated Seams

    By T. G. Rozgonyi

    The basic goal of this investigation was to determine the degree of drying of high moisture lignite through the use of high temperature and pressure steam autoclaves. Specific items studied were: a) t

    Jan 1, 1984

  • SME
    Alternatives To Pumping?

    By R. L. Loofbourow

    Most wet mines face unquantified water costs as well as the obvious wing costs. Both kinds of cost are multiplied by work at greater depth and by higher unit prices. This intensified challenge merits

    Jan 1, 1980

  • SME
    In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs

    By Sean Harvey

    One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall

    Jan 1, 2009

  • RMCMI
  • AIME
  • SME
    WBGT Prediction and Improvement in Hot Underground Coal Mines Using Field Investigations and VentSim Models - Mining, Metallurgy & Exploration (2023)

    By Siddhartha Roy, Hemant Agrawal, Ram Madhab Bhattacharjee, Devi Prasad Mishra

    Heat stress in underground coal mines is a major threat to the health and safety of the miners. Hence, managing heat and prediction of heat stress in advance is essential for maintaining a safe, healt

    May 10, 2023

  • SME
    Operating Experience At The Malmberget Straight Grate Pelletizing Plant ? General

    By R. R. Odman

    The Malmberget Division of LKAB is located 70 km north of the arctic circle and has about 2000 employees. The dominating products are sinter feed concentrate and pellets. A general flow sheet for the

    Jan 1, 1979

  • SAIMM
    Performance Improvements Provided By Mintek's Floatstar- Advanced Control System On Reverse Flotation Of Iron Ore ? Synopsis

    By B. D. H. Knights

    In November 2009 Mintek installed the FloatStar? advanced flotation stabilization system on Vale's Cauê iron ore beneficiation plant in Brazil. In September 2010 the system was upgraded to includ

    Jan 1, 2012

  • AUSIMM
    Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project

    By R Godard, J Gantumur, F Prince, C Pascoe

    Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera

    May 9, 2016

  • SME
    Mechanisms Of Respirable Dust Generation Continuous Miner

    By A. W. Khair

    This paper presents an analysis of respirabie dust generation due to the action of a continuous miner. Underground coal cutting by a drum-type continuous miner was simulated in the laboratory using a

    Jan 1, 1985

  • NIOSH
    RI 4967 Use of Torque Wrench to Determine Load in Roof Bolts Part I. Slotted-Type Bolts

    By L. A. Panek, A. J. Barry, John A. McCormick

    "INTRODUCTION During recent years, roof bolting has become widely accepted as a systematic method of supporting both coal- and metal-mine roofs. Today, over 2 million roof bolts are installed monthly.

    May 1, 1953

  • SAIMM
    Bioleaching and beneficiation of Agbaja iron ore using Providencia vermicola KUBT-1 under varying process conditions

    By C. N. Eze, C. K. Ezeh, O. Nnabuife, N. M. Ugwoju, S. C. Enemuor, V. Okechukwu

    In this study, the efficacy of Providencia vermicola KUBT-1 in the leaching and beneficiation of Agbaja iron ore was evaluated under varying conditions of temperature, ore particle size, and pH. Agbaj

    Dec 15, 2025

  • CIM
    Ore Deposit Knowledge – The Value of Continuous Improvement

    By K. Gardner

    "Many deposits have a geological model developed early in the project stages, which is not always reviewed or modified as the project matures and production commences. Conversely, ongoing pressures, d

    Jan 1, 2017