IC 8244 Minerals For Chemical Manufacturing - A Survey Of Supply And Demand In California And Nevada (10bd1549-e2a6-4695-a7aa-c437b8aa19de)By Wallace W. Key
Mineral raw materials produced in California, other States, and foreign countries were purchased for consumption in quantities valued at over $60 million at 800 of the 1,200 chemical plants operating
Jan 1, 1965
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission LineBy Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
The Benefits and Challenges of “Split Milling” at the Williams MillBy Glenn Norris, Tyler Buckingham
"Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini
Jan 1, 2010
-
The Hydraulic Transportation of SandsFactors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical
Jan 1, 1959
-
Bulletin 171 Melting Brass in a Rocking Electric FurnaceBy H. W. Gillett, A. E. RHOADS
In its study of methods for reducing metal losses in the non- ferrous metal industry, the Bureau of Mines has conducted a long series of experiments on electric brass melting and collected much data o
Jan 1, 1918
-
An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)By Xingtian Hui
Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry
Jan 1, 2009
-
The First Electrolytic Copper Refinery in the USA at the Chemical Copper Co. Phoenixville, Pa – History RevisitedBy E. Wraith, W. W. Culver, B. Wesstrom, P. J. Mackey
Electrodeposited copper of the 1860s was of unprecedented purity, although the profound significance of this achievement was not fully realised until the dawn of the electrical age a decade or so late
Jan 1, 2019
-
Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBMBy Martin Herrenknecht
After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between
-
Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)By David Conover
The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo
Jan 1, 2009
-
Quartzites purs du QuebeciaBy Jehan Rondot
Les bancs de quartzite inhabituellement purs et epais decouverts lors de la cartographie geologique de la region de Charlevoix sont maintenant entres au stade de !'exploitation et se revelent etre une
Jan 1, 1984
-
The Chemical Treatment of Gold Slime for the Recovery of High Purity Gold and SilverThe ready solubility of gold in dilute aqueous solutions of the cyanides of the alkalies or alkaline earths provides a convenient method for the separation of the precious metal -from the large surplu
Jan 1, 1956
-
Mechanical Shoveling In Underground Metal Mines - IntroductionBy McHenry Mosier
Mechanical loading, adopted long ago in open-pit, coal, and non-metal mines, was not used extensively in underground metal mines until the World War. In less than a decade it became standard practice
Jan 1, 1940
-
Volcanogenic massive sulphide deposits of the Noranda Cauldron and Shield Volcano, QuebecBy Harold L. Gibson, David H. Watkinson
"Volcanogenic massive sulphide deposits of the Noranda Camp cur throughout the Noranda Shield Volcano but are concentrated and along the margins of the Noranda Cauldron. The deposits are realized alon
Jan 1, 1990
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case StudyBy William D. Monaghan, Michael A. Trevits
Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conductin
-
Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster FacilityBy Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke
"The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
Advancing Comminution And Flotation Performance With Advanced Process ControlOften plant performance suffers as a result of poor control. Poor control leads to low mill throughputs, poor classification and less than satisfactory concentrate grades and overall recoveries. By
Jan 1, 2005
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil ParametersBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine DevelopmentBy Kot F. Unrug
In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a
Jan 1, 1994