Search Documents

  • TMS
    Adsorption of the Oxyanions of Arsenic onto Lanthanum Oxide

    By A. Rawat

    The removal of oxyanions of arsenic present in mine process water and drinking water to a regulatory level is a challenging problem. Recently a patented adsorbent lanthanum oxide has been developed wh

    Jan 1, 1998

  • NIOSH
    RI 8644 Underground Gob Gas Drainage During Longwall Mining (371fb31d-0a18-483c-8e9c-57e088c46797)

    By Steven J. Schatzel

    Gas drainage through surface bore-holes has been the conventional means of methane control for U.S. longwall gobs. However, these vertical boreholes are becoming so costly, and the surface rights so d

    Jan 1, 1982

  • IMPC
    Using The Methods Of TRIZ To Generate Innovative Approaches To Resolve The Minerals Industry-Environment Conflict

    By M. S. Prithvi

    Over the decades, mine and mineral processing plant operations for the most part, have been found to have had adverse impacts on the environment. At the same time, mineral processing and mining operat

    Sep 1, 2012

  • SAIMM
    Benefits of Including Resistivity Data in a Resource Model — An Example from the Postmasburg Manganese Field

    By C. Birch, J. Perold

    "Due to the challenging geological environment of the Postmasburg Manganese Field (PMF), a study was conducted to determine if any benefits would derive from the inclusion of resistivity data during t

    Mar 1, 2019

  • SME
    An Environmental Audit Program

    By Peter Keppler, Charles Jackson

    WHY DO AN AUDIT? There is increased enforcement of environmental laws and regulations at State and Federal levels with attendant steep fines and even the possibility of jail sentences. We are al

    Jan 1, 1991

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • CIM
    Synthesis and Characterization of Chalcogen Based Materials in Glassy and Nanostructured forms: A Review

    By Gurinder Kaur

    Selenium (Se) based materials find wide applications in rectifiers, solar cells, photographic exposure meters, data storage devices, xerography and anticancer agents. They are also used in the glass i

    Aug 1, 2013

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • CIM
    Waite Amulet Mine: Amulet Section

    "The Waite-Amulet, an important copper-zinc mine, lies astride the Duprat-Dufresnoy township boundary about 8 miles northwest of Noranda, Quebec. It is an amalgamation of two properties, that of the f

    Jan 1, 1954

  • CIM
    Design of Agitators for Storage and Surge Tanks with High Yield Stress Fluids

    By J. Jung, W. Keller, N. Rohn

    In hydrometallurgical minerals processing slurries are often processed at very small grind sizes and high solids concentrations. This normally results in flow anomalies of such slurries. Due to flow l

    Jan 1, 2014

  • NIOSH
    IC 6674 Shaft-Sinking Methods And Costs, And Cost Of Plant And Equipment At The Macassa Mine, Kirkland Lake, Ontario - Introduction

    By G. A. Howes

    This is one of a series of circulars dealing with the cost of equipping and developing mining properties in the United States and Canada, prepared and published by the Bureau of Mines in cooperation w

    Jan 1, 1932

  • SME
    The Greatest Challenges in TBM Tunneling: Experiences From the Field

    By Jim Clark

    Tunnel boring machine (TBM) tunneling is an ever-increasing prospect for underground construction, and, with each new tunnel bored, there are unknown elements. When boring through the earth, even ext

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects (dae23bc9-3905-422e-864b-fd90283ea9ed)

    By R. E. Mitchell

    The environmental impact assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible d

    Jan 1, 2012

  • CIM
    Fuel Cell Risk Assessment, Regulatory Compliance, and Implementation of the World?s First Fuel Cell-Powered Mining Equipment at the Campbell Mine

    By Fred C. Delabbio

    The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of sa

    May 1, 2003

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • CIM
    The Discovery and Delineation of the Heavy Mineral Sand Orebodies at Graauwduinen, Namaqualand, Republic of South Africa

    By G. L. Palmer

    "Abstract- ln 1986, anomalous sampling results for heavy minerals were obtained at various sites in Namaqualand on the west coast of the Cape Province. Drilling in 1987 at Graauwduinen penetrated up t

    Jan 1, 1994

  • CIM
    Silica-Kaolin Deposits of Algocen Mines Limited

    By D. E. Smith, M. K. Murthy

    "The commercial potential of a silica-kaolin deposit that occurs on the banks of and close to the Missinaibi River in the District of Cochrane, Ontario, is under evaluation by Algocen Mines Limited. T

    Jan 1, 1970

  • AIME
    Iron Ore Beneficiation

    By Clyde E. Williams

    MUCH has been said recently concerning the depletion of the Lake Superior iron ore re- serves. Estimates given indicate a total life of the present known reserves of twenty to thirty years. Some argue

    Jan 1, 1931

  • SAIMM
    Limiting the Influence of Extreme Grades in Ordinary Kriged Estimates

    "The management of outlier grades in positively skewed gold distributions is a contentious issue. Incorporating outliers in standard ordinary kriging (OK) estimation procedures in a way that honours t

    Apr 1, 2019

  • AUSIMM
    Use of ?Tunnel Boring Machines in the Mine Environment

    By D Mather, H R. Asche

    "In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,

    Sep 17, 2014