Search Documents

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • SAIMM
    Just-In-Time Development Model For A Sub-Level Caving Underground Mine In Zimbabwe

    By C. Musingwini

    Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.

    Jan 1, 2003

  • SME
    Automation Controls Can Lower Plant Costs

    By Steve Kral

    Not too many years ago, mining was in one of its cyclic down-sides. This forced mining companies into some innovative thinking to bring down the costs of production. And they have. Mining equipment

    Jan 1, 2006

  • NIOSH
    RI 7669 Analysis Of Fracture Orientations For Input To Structural Models Of Discontinuous Rock

    By M. A. Mahtab

    This report presents a new procedure for analyzing the orientations of rock fractures in an engineering site. This procedure, coded in a computer program, identifies clusters or groupings among the fr

    Jan 1, 1972

  • AIME
    Part XI - Papers - Techniques for Analyzing Combined First- and Second-Stage Creep Data

    By M. J. Mullikin, J. B. Conway

    Equations capable of representing combined first -and second-stage creep behavior include the Andrade, Cottrell-Aytekin, Garofalo, and de Lacombe equations along with a third-degree polynomial in t1/3

    Jan 1, 1967

  • SAIMM
    Annual Report - For The Year Ended 30th June 2006

    Council for 2005/2006 President W.H. van Niekerk President-elect R.P.H. Willis Vice-presidents Senior R.G.B. Pickering Junior A.M. Garbers-Craig Immediate Past-president F.M.G.

    Jan 1, 2006

  • CIM
    Flotation of the Major Copper Sulphide Minerals – An Electrochemical Viewpoint

    By A. R. Barnes, N. O. Lotter

    Recoverable economic copper sulphide minerals such as chalcopyrite, bornite, chalcocite and covellite often occur together in varying proportions in the major copper-bearing ores, and have individual

    Jan 1, 2016

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • NIOSH
    IC 8680 The Reserve Base Of U.S. Coals By Sulfur Content (In Two Parts) 1. The Eastern States

    By Robert D. Thomson

    The Bureau of Mines has compiled coal reserve data for the United States as of January I, 1974, for bituminous and anthracite coalbeds 28 inches or more in thickness to a maximum depth of 1,000 feet a

    Jan 1, 1975

  • NIOSH
    Remote Vision System for Dozers on Coal Stockpiles

    By William H. Schiffbauer, Timothy Lutz, Michael R. Yenchek

    The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL) participated in an experiment to facilitate the remote control of dozers used on coal stockpiles.

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • ISEE
    Carbon Monoxide Poisoning – Commercial Explosives, Rock Blasting and Construction Work in Inhabited Areas

    By Nadya Michel, Daniel Gros-Jean

    This is a true story. Names have been changed to illustrate the importance and impact of carbon monoxide risk management in explosive blast projects and the community « Honey I’m not feeling good…” “W

    Feb 6, 2023

  • NIOSH
    RI 2747 Study Of The Reactions In An Iron Blast Furnace

    By S. P. Kinney, P. H. Royster, T. L. Joseph

    "The study described in this paper, on the reactions in an iron blast furnace, is part of the investigation being conducted by the Bureau of Mines on combustion of coke and the reduction of iron oxide

    Apr 1, 1926

  • SAIMM
    Annual General Meeting of the Institute

    The Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 24th August, 1977. Dr M. D. G. Salamon (President) was in the chair and dec

    Jan 1, 1978

  • NIOSH
    Measurement Of Airflow In A Simulated Underground Mine Environment Using An Ultrasonic Anemometer

    By M. J. Senk, A. Lusin

    Federal regulations require that methane liberated at the face be diluted and removed to maintain methane gas concentrations below 1 pct (CFR) in working places and intake air courses. The delivery a

  • DFI
    The Seven Steps To Foundation Retrofit

    By Javier Rodriguez

    Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves

    Jan 1, 2006

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • NIOSH
    In-Mine Evaluation Of Smart Mine Fire Sensor

    By R. A. Franks, G. F. Friel, J. C. Edwards, A. C. Smith

    An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system's abil