  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • NIOSH
    Use Of The Mining Rock Mass Rating (MRMR) Classification: Industry Experience

    By Gabriel S. Esterhuizen, Jarek Jakubec

    In 2000, Laubscher’s Mining Rock Mass Rating (MRMR) classification system was updated and published. The new system brought a few fundamental changes that were in direct response to the challenges and

    Jan 5, 2007

  • CIM
    Stochastic Simulation of Open Pit Pushbacks with a Production Simulator

    Material scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti

    May 1, 2004

  • SME
    Pillar Recovery At The Buick Mine

    By David E. Nicholas, Steven R. Dismuke, Paul F. Cicchini

    The Buick mine, located 195 kilometers (120 miles) southwest of St. Louis in the Viburnum Trend, is owned and operated by Homestake Mining Company. The mine produces lead and zinc ore from a room and

    Jan 1, 1986

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • SME
    Fluid Flow Analysis Of A Model Leach Pad Using Temperature Probes

    By G. G. Gold

    A leach pad’s fluid flow characteristics greatly affect the recovery of metals from heap leaching. However, because there are other factors such as particle size distribution, application rate and met

    Jan 1, 2004

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • NIOSH
    Numerical Analysis Of The Influence Of In-Seam Horizontal Methane Drainage Boreholes On Longwall Face Emission Rates

    By S. J. Schatzel, W. P. Diamond

    High methane emissions originating from the active face areas and from the fractured formations overlying and underlying the mined coalbed can adversely affect both safety and productivity in undergro

  • SME
    Members Ready for Mining Industry Upswing at SME’s Annual Meeting

    By Steve Kral

    It seems that mining has been in the doldrums for awhile. Except for gold, metals prices remain depressed. And economic conditions in the United States and around the globe have put governments in a

    Jan 1, 2003

  • AIME
    Final Adjourned Annual Business Meeting.

    By AIME AIME

    The following abstract of the minutes of the final Adjourned Annual Business Meeting, held Nov. 12, 1912, in the office of the Institute, 29 West 39th Street, New York City, is here presented for the

    Dec 1, 1912

  • SME
    Effects Of Joint Persistence On Jointed Rock Masses

    By W. G. Pariseau

    Equivalent elastic properties of discontinuously jointed rock masses are computed using a non-representative volume element(NRVE) approach within a three dimensional finite element program. Joint pers

    Jan 1, 2003

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • ISEE
    Visualization of Cratering in an Underwater Environment

    By D. J. Goodings, R. J. Bonenberger, H. U. Leiste, W. L. Foumey

    This paper describes a series of two-dimensional tests conducted and filmed with a high-speed (500 frames per second) video camera. The purpose of these tests was to provide a better understanding of

    Jan 1, 2000

  • AUSIMM
    On a New Phosphate Deposit in the Howqua District, Near Mansfield, Victoria

    By Teale E. O

    The purpose of the present communication is to put on record the discovery, in October, 1916, in the Howqua district, of a new locality for the occurrence of phosphatic rocks in Victoria, and to give

    Jan 1, 1918

  • AUSIMM
    Fault and Shear Characterisation in Archean Banded Iron Formation Bedrock - A Comparison between Core and Televiewer Data Collection Techniques

    By M Eggers, H Baxter

    This paper discusses the geotechnical condition of bedding shears and small- and large-scale faults and shears in Archean banded iron formation (BIF) bedrock, based on observations of core and televie

    Aug 12, 2013

  • CIM
    Design and wear of SAG mill shell liners at Brunswick mine

    By C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski

    "An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea

    Jan 1, 2005

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • NIOSH
    The Mineral Industry Of Other Areas Of The Far East And South Asia - Bangladesh (0e11f91d-11fe-413b-9cfb-2647e57b907e)

    By E. Chin

    The domination of Bangladesh's mineral industry by natural gas was in for some possibly significant changes. A modest flow of crude oil was struck in a gas development well in the northeastern co

    Jan 1, 1988

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • NIOSH
    RI 3549 Measuring Particle-Size Distribution And Colloid Content Of Oil-Well Drilling Fluids ? Introduction

    By George L. Gates

    [When clays are mixed with water to -.,tee mud fluids for use in trilling wells for nil and --ac b ;l-,e rotary method the liquid mixtures have certain physical characteristics that vary with the quan

    Jan 1, 1941