Search Documents

  • DFI
    Roger Bullivant Cone Pile

    By R. A. Bullivant

    Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten

    Jan 1, 1992

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • AUSIMM
    Tumbling Mills and Breakage Processes

    Tumbling mills and some theoretical and practical aspects of milling are discussed. Attention is directed towards the difficulty of relating the dynamical analyses of the motions of particles within m

    Jan 1, 1957

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • SME
    Accelerated leaching of mine spoils as means of reducing specific conductivity - SME Transactions 2015

    By S. A. Smith-Hamm, E. A. Sarver, A. S. Cox

    Appalachia is an increasing concern, as unnaturally high TDS and/or associated specific conductivity (SC) may contribute to deteriorated stream ecosystem health. The aim of this preliminary study was

    Jan 1, 2015

  • ISEE
    Large Hole Rotary Drill Performance

    By J Lyall Workman, Peter N. Calder

    "Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac

    Jan 1, 1996

  • SAIMM
    The Effects Of Inert Matters And Low Volatile Coal Addition On The Plasticity Of High Volatile Zonguldak Coals

    By V. Arslan

    In this study, effects of the inert constituents, such as ash, and the effect of blending coals with differing rank and composition on the plasticity of coal blends were investigated. The reference co

    Jan 1, 2006

  • AUSIMM
    Removing the Overburden? Proposals to Amend the Resource Management Act 1991

    By M Cooper

    Since its enactment in 1991, the Resource Management Act (RMA) has generated both praise and criticism. The major criticism is in relation to the costs the Act poses to industry and the time it takes

    Jan 1, 1998

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • NIOSH
    OFR-75-86 Development Of A Reduced-Noise Auger Miner Cutting Head

    By Mark R. Pettitt

    Noise surveys conducted in underground coal mines have consistently indicated that auger mining machines subject the operator and helpers to excessive noise exposure. The machine cutting heads have be

    Jan 1, 1983

  • SME
    State Summaries ? Arizona

    By N. Niemuth

    Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea

    Jan 1, 2008

  • CIM
    New Developments in Air Compressors

    By D. C. Crothers

    "What is new in air compressors? A good deal - the designers have been keeping pace with technical developments in related fields and also contributing new techniques of their own. Plant reliability n

    Jan 1, 1972

  • NIOSH
    IC 6165 Consumption Of Tin In The United States During 1928

    By J. B. Umhau

    During 1928 the United States consumed 73,270 long tons of virgin or primary tin, which was approximately 7.5 per cent more than the 68,198 long tons con¬sumed in 1927 and equaled 41 per cent of the w

    Jan 1, 1929

  • SME
    Grinding Mill Scale-up Problems

    By N. Arbiter, C. C. Harris

    The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o

    Jan 1, 1982

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • DFI
    Reliability of the Bearing Capacity of Axial Piles Using In Situ Tests

    By António A. Henriques, António Gomes Correia, Ana Teixeira

    "Abstract Pile foundations are often used for important structures, and thus, reliability evaluation is an important aspect of the design. Reliability methods have become increasingly important as dec

    Jan 1, 2014

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • IOM3
    Electrochemical removal of lead from aluminium using fused salts

    By F. Tailoka, G. Zhao

    Pb is an unwanted impurity in Al for which there is no established method of removal. As it interacts strongly with alkali metals, separation was achieved by adding Na or K to molten Al at 953-1 003 K

    Apr 1, 1995

  • SAIMM
    Peak particle velocity prediction using support vector machines: a surface blasting case study

    By S. R. Dindarloo

    Although blasting is one of the most widely used methods for rock fragmentation, it has a major disadvantage in that it causes adjacent ground vibrations. Excessive ground vibrations can cause a wide

    Jan 1, 2015