    A Method to Design Optimum Pastefill Mixes Through Flow Cone and Mini Slump cone Testing

    By Kugan Kuganathan

    Pastefill is being increasingly considered as a viable fill by underground mine operators. Mount Isa Mines (MIM) chose pastefill to fill their deep copper mine (>1200m deep) after considering various

    Jan 1, 2001

  • AUSIMM
    Pilot Plant Objectives and Considerations for Evaluating the Waste Disposal of High Slimes Heavy Mineral Sand Deposits

    By N Ross, N Goldup

    In recent years the heavy mineral mining industry has started to look more closely at the feasibility of mining moderate to high slimes deposits. During the initial stages of orebody evaluation the pr

    Jan 1, 2001

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • SME
    American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock

    By S. Schina

    Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme

    Jan 1, 2001

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • SME-ICGCM
    Numerical Simulation on Microseismicity Due to Mining at One of the Collieries in Australia

    Numerical simulation for microseismicity due to mining at one of the collieries in Australia was carried out and the results were compared to the observed microscismicity. 3-D Stress analysis showe

    Jan 1, 2001

  • SME
    Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\

    By Massimo Concilia, Remo Grandori, Paolo Nardone

    Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excav

    Jan 1, 2001

  • CIM
    Aspects of mining R&D in Australia (765b26a3-c30d-4d4d-843b-4cdffd30f3eb)

    "The Cooperative Research Centre for Mining Technology and Equipment (CMTE) is funded by the Commonwealth Government, by its mining research members — the Universities of Queensland and Sydney and the

    Jan 1, 2001

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • SME
    Geology Of The Storm Gold Deposit, Northern Carlin Trend, Nevada

    By R. Hipsley, D. Arbonies, P. J. Dobak, M. Visher

    The Storm deposit is a high grade breccia hosted “Carlin-type” gold deposit located at the north end of the Carlin Trend. Storm consists of 3 smaller deposits: 1) 49er Zone, 2) End Zone, 3) Discovery

    Jan 1, 2001

  • ISEE
    Improve Milling Through Better Powder Distribution

    By Jack Eloranta

    Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces

    Jan 1, 2001

  • CIM
    The Geological Setting and Estimation of Gold Grade of the High-grade Zone, Red Lake Mine, Goldcorp Inc.

    By Stephen Mcgibbon, Tim Twomey

    "Abstract - The High-grade Zone (HGZ) was discovered 5000 ft (1520 m) below surface in the hangingwall of the existing orebody, 46 years after the Red Lake mine first went into production. The very ri

    Jan 1, 2001

  • ISEE
    Regulatory Review of Blasting Related Citizen Complaints

    By Kenneth Eltschlager

    The Surface Mining Control and Reclamation Act of 1977 requires that blasting be conducted so as to prevent injury to people and damage to public or private property. The three adverse effects are fly

    Jan 1, 2001

  • ISEE
    ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus Tests

    By E. Contestabile, B. von Rosen, P. Lightfoot

    As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the

    Jan 1, 2001

  • TMS
    Production and Recycle of Dust

    By W. G. Davenport

    The offgas from flash furnaces inadvertently contains dust. The dust contains 25 to 30% Cu so it must be treated for Cu recovery. This is almost always done by recycling it back through the flash furn

    Jan 1, 2001

  • TMS
    A New Numerical Model for Predicting Carbon Concentration During RH Degassing Treatment

    By Young-Geun Park

    A new decarburization model for the RH system was constructed for calculating the decarburization reaction using a three-dimensional fluid dynamics program. The entire fluid flow in the RH process was

    Jan 1, 2001

  • SAIMM
    Shotcrete Lining Of South Deep Shafts

    By W. P. Erasmus

    This paper will focus on the use of the ?wet-mix? steel fibre re-in forced shotcrete as a permanent lining in deep shafts, assessing gold bearing reef. It will cover all aspects relating to the choice

    Jan 1, 2001

  • TMS
    The Effect of Phase Decomposition in Quaternary Chromite Spinel on the Extraction of Chromium as Sodium Chromate During Oxidative Alkali Roasting .

    By V. D. Tathavadkar

    Natural chromite mineral is a solid solution of spinet end members namely: chromite (FeCr2O4), hercynite (FeA1204), magnetite (Fe3O4), magnesio-chromite (MgCr2O4), (MgA12O4), and magnesio-ferrite (MgF

    Jan 1, 2001

  • TMS
    The Use of Data Reconciliation as a Soft Sensor in Various Hybrid Modelling and Control Architectures for Pyrometallurgical Furnaces

    By Markus A. Reuter

    In this paper various hybrid modelling architectures are proposed for the modelling and metallurgical control of pyrometallurgical reactors. Discussed are architectures in which data reconciliation is

    Jan 1, 2001

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001